Toggle Offcanvas
...
 
Bio Mass Tenders

Bio Mass Tenders

View bio mass tenders, RFPs and contracts. Bid on readily available bio mass tenders with the best and most comprehensive tendering platform, since 2002.

Bidding for bio mass tenders is extremely lucrative for companies of all sizes. Tendering authorities and private companies release thousands of contracts worth millions for procurement of bio mass.

Global Tenders stands out as the largest platform dedicated to tenders and government contracts. Boasting over 20 years of experience in the tender business, GlobalTenders offers the most extensive and reliable Tenders/RFPs/Contracts Database available. The platform aggregates contracts from both public and private sources, connecting with a vast network of over half a million buyers. Employing advanced artificial intelligence, our meticulous process involves gathering information from over a hundred thousand sources. The data is then intelligently categorized into thousands of subcategories for easy filtering and presenting it in a user-friendly format for quick comprehension.

In addition to tender information, we offer in-depth bio mass market analysis, bid consultancy services, and insights into top bidders and winners.

Sign up now to get instant access to unlimited bio mass tenders, advanced search filters, market analysis, industry trends, tender training and 24/7 customer support.

153 Live Notices for Bio Mass Tenders

Showing 1 to 20

Chopper/Blender/Hammermill-Equipment Procurement For The Natural Resources Institute Finland
country Finland
posting date22 Mar 2025
deadline31 Jul 2025
Work Of Reform Of The Heat Charx And Boiler Of Biomass To The Municipal Equipment Of Sant Salvador De Guardiola
country Spain
posting date22 Mar 2025
deadline15 Apr 2025
A Number Of Tonnes Of Wood Splinters Must Be Supplied From The Forest, Which Is The Result Of Multiplying The Unit Price By Tona De Estella By The Number Of Tons That Are Really Supplied, During The Period Of Validity Of The Contract, And That In No Case Will Be Able To Exceed The Estimated Value Of The Contract (Vec). The Base Tender Budget And The Vec Has Been Calculated Taking Into Account An Estimated Supply Of 1,152 Tons Of Wooden Chip From Forest, For The Estimated Period Of The Contract. The Splinters Supplied In Each Order Will Be Classified As Class A2-P31S With Less Than 30% Of Humidity According To Iso 17225-4: 21. They Need To Be Biofuel Agroforestal Wooden Agroforestry From The Forest That Complies With The Following Une-En Iso Rules And Is Among The Humidity Ranges, Particle Size, Ash Content And The Following Calorific Power: Analysis Analysis Value Units Une-En Iso 17225-1 Origin And Source 1.1.3 Une-En Iso Trunk 18134-2 Humidity Between 20 And 30 % Wet Base 17827-1 Particle P31S Une-En Iso 18122 Content In Equal Or Lower Ashes 1.5 % Dry Base Une-En Iso 18125 Calorific Power Greater Than 3,557.69 Kwh/T, H If The Splinter Does Not Meet The Established Requirements And Produce Some Deterioration In The Biomass Boiler, Will Be Imprinted In The Contractor, In Addition To The Costs Of Its Repair, Failure For Serious Infraction Of The Essential Obligations Of The Contract, Which May Result In The Resolution Of It, And The Claim Of Damages. It Is Reported That The Silo Has A Capacity Of 106 M3 Gross Or 85 M3 Net. Transportation Is Included In The Place Of Deposit Of The Aquatic And Sports Complex Of Can Mercader, Having To Fill The Silo Pneumatically. It Is Indicated In The Pptp Where The Splinter Must Be Deposited.
country Spain
posting date22 Mar 2025
deadline24 Mar 2025
Supply Of Forest Splinters For The Biomass Boiler Of The Heat Network That Supplies The Pool And The Municipal Pavilion.
country Spain
posting date22 Mar 2025
deadline04 Apr 2025
Waste Collection 020103 In The Form Of Biomass
country Poland
posting date21 Mar 2025
deadline26 Mar 2025
Single Design Of Design And Realization Of A Platform Biomass Heating Installation (Lot Controlled By Lot 1 Of The C2023/097 Market)
country Belgium
posting date21 Mar 2025
deadline24 Apr 2025
Electricity Works Contracts Control Relating To The Construction Of Two New Boiler Rooms In The Context Of The Development Of The Urban Heating Network
country France
posting date21 Mar 2025
deadline18 Apr 2025
Climate Engineering Works.
country France
posting date21 Mar 2025
deadline22 Apr 2025
Carbon, Nitrogen, Hydrogen And Sulfur Apparatus In Organic, Inorganic Solids And Liquids By The Combustion Method.
country Bulgaria
posting date21 Mar 2025
deadline23 Apr 2025
Forest Use 2024
country Spain
posting date21 Mar 2025
deadline04 Apr 2025
Substitution Of Non -Renewable Energy Consumption In The Municipal Facilities Of Lliçà D'Amunt: Adult School Of The Valley Of Tenes, Els Picots And Sports Pavilion, Used For Thermal Production In The Boiler Rooms Of The Buildings, By Heat From Biomass From A Centralized Boiler Of Forest Splinters
country Spain
posting date21 Mar 2025
deadline09 Apr 2025
Supply Of Forest Splinters For The Biomass Boiler Of The Heat Network That Supplies The Pool And The Municipal Pavilion.
country Spain
posting date21 Mar 2025
deadline04 Apr 2025
2025-014 Supply, Realization Of The Piping For A Biomass And Gas Boiler Room
country France
posting date20 Mar 2025
deadline04 Apr 2025
2025-015 Supply, Installation And Commissioning Of The Supply And Distribution In Electricity (Cfo) And Communications (Cfa) For A Biomass, Gas And A Pumpery At 80100 Abbeville
country France
posting date20 Mar 2025
deadline04 Apr 2025
Carbon Transport And Storage
country Denmark
posting date20 Mar 2025
deadline04 Apr 2025
Heat Network Lenzerheide Power Increase Energy Center
country Switzerland
posting date20 Mar 2025
deadline02 May 2025
Project Management Mission For The Creation Of A Biomass Boiler And A Heat Network At The Rouffach Hospital Center
country France
posting date19 Mar 2025
deadline21 Apr 2025
Dsp Saverne-Lot 31-0: Hydraulic Work And Including The Supply
country France
posting date19 Mar 2025
deadline03 Apr 2025
Dsp Saverne-Lot 32-0: Water Treatment
country France
posting date19 Mar 2025
deadline03 Apr 2025
Acquire Industrial Gases For The Development Of Laboratory Tests Within The Framework Of The Project "Study The Transformations Of The Inorganic Material Of Colombian Residual Biomass During
country Colombia
posting date19 Mar 2025
deadline02 Apr 2025

Share Share this page