174 Live Notices for 生物质量招标
Showing 1 to 20
Supply And Delivery Of Inrae Val De Loire Wood Plates.
Supply Of Biomass For Boilers Located At La Molina Mountain Station (Ref.Poss39/25)
Replacement Of The Current Thermal Energy Production System With A Biomass Boiler, In The Ceip Macià Companys Building, In Agramunt In The Framework Of The Recovery, Transformation And Resilience Plan Funded By Next Generation Fund.
Acquisition Of A "Slow" Crusher For Green, Strains, Wood B, Biomass And Bulky Waste.
Realization Of A Biomass Boiler With Heat Network In Frotey Les Vesoul (70)
Moz22005-10079 – Moz22005-10079 Evaluation And Preparation Of Renewable Energy Strategy And Strategy For Conservation And Sustainable Use Of Biomass Energy
Realization Of A Biomass Boiler With Heat Network In Frotey Les Vesoul (70)
Evaluation And Preparation Of Renewable Energy Strategy And Strategy For Conservation And Sustainable Use Of Biomass Energy
Supply Of Biomass For Boilers Located At La Molina Mountain Station (Ref.Poss39/25)
Supply Of Pellets As A Biofuel Sustenance For The Biomass Boilers Of The Hon. Ávila City Council
It Is A Contract Of Works That Involves The Replacement Of The Existing Diesel Boiler With A New Biomass Installation, Including Biomass Boiler, Biomass Storage And Transportation Between Storage And Boiler. The Performance Will Also Act On The Primary Distribution Circuit, In The Existing Boiler Room, In Order To Connect The New Boiler To The Existing Distribution Circuits. The Hydraulic Installation (Primary Circuit) Inside The Es Vella And Inefficient Boiler Room, For This Reason The Existing Distribution Collections Will Be Replaced In The Boiler Room And The Circulatoring Pumps Documentation And Final Management Of The Work. Currently As A Thermal Energy Production Apparatus For Heating There Is A Cpa 250 Roca Boiler, With A Nominal Power Of 290.7Kw. This Boiler Incorporates A Techno Burner 28 -L With A Power Of 95/166 - 332Kw. This Boiler, And More Specifically Its Burner, Use Diesel As Fuel. No Inertia Deposit Is Available. There Are 2 Collectors, Impetus And Return. At The Exit Of The Collectors There Are 4 Secondary Branches That Supply The Different Radiators Spread Over The Building. Each Branch Has Its Driving Group. - Of The 4 Branches 2 Are 2 "And The Other 2 Are 1 1/4". This Installation Is Responsible For The Heating Of The Building. It Does Not Produce A.C.S. It Is Proposed To Replace The Existing Boiler With A New Biomass Boiler, Caldera Herz Firematic 301 T-Control, Up To 301Kw Of Power, With The Capacity To Use Pellet And Splinters As Fuel.
"Modernization Of The Municipal Heat Energy Production System In Ustka"
Substitution Of Diesel Boiler By One Of Biomass In The Plane Emergency Post
Technical Control Mission For The Adaptation Of The Network Of Urban Heating Control To The Integration Of Deep Geothermal Energy And Implementation Of A 5Th Generation Heat Network With P.
Level 3 Sps Coordination Mission As Part Of The Creation Of A Biomass Boiler, A Technical Network And Thermal Renovation Of The Post Office
Technical Control Mission As Part Of The Creation Of A Biomass Boiler, A Technical Network And Thermal Renovation Of The Post Office
Dieole Boiler Relay For A Biomass In The Airplane Emergency Stall
Pellet Supply For Boilers Hosp. Angol
[G042500279] Bidding Of Domestic Biomass Purchase Bidding In Korea In August-September 2025 (Sps04)
Electricity Supply For A Period Of 24 Months