12474 Live Notices for Concursos na Polónia
Showing 1 to 20
Development Of Plot No. 672 In Moczydło 45000000-7
Thermomodernization Of The Forester'S Building In Gródek - Proceedings No. 2. 45200000-9
Construction Of A Photovoltaic Installation In The Wisła Forest District Divided Into 2 Tasks: Task No. 1: Construction Of A Photovoltaic Installation For The Carpathian Gene Bank 43-476 Jaworzynka 812. Task No. 2: Construction Of A Photovoltaic Installation For The Building Building 09332000-5
Adaptation Of Primary School Facilities To Compliance With Fire Regulations - Replacement Of Carpets In The Building Of Primary School No. 7 In Oleśnica At Ul. November 11 10 45432100-5
"Maintaining The Passage Of Forest Roads In 2025" 45233220-7
Maintenance And Maintenance Of Forest Roads In The Kobiór Forest District In 2025 45233220-7
"Rd7 Pe Czarnków - Modernization Of The Maneuvering Square And The Pe Component Square (Replacement Of 2 Storm Sewage And Concrete Cubes)."
"Rd7 Piła - Modernization Of The Kitchen, Office And Corridor Of The Maintenance Section With Equipment (2Nd Floor Building No. 1B)".
Development Of A Construction Project And Construction Of A Power Network To Connect To The Solar Plant Network: "Gubin", S-2024-10798
Res Development In The Scope Of Sn 15Kv Enea Operator Sp.Z O.O. Distribution Department Bydgoszcz. Task Implemented In The "Build" Mode. Task No. 1 - Reconstruction Of The Sn 15 Kv Overhead Line Gpz Trzemeszno - Dąbrowa. Task No. 2 - Reconstruction Of The Sn 15 Kv Gpz Trzemeszno - Alejowa Overhead Line. S-2020-01029, S-2020-02945
Changing The Category Of Travel From A To B Together With The Installation Of Ssp Devices At The Rail And Road Crossing Of The Railway Line No. 139 At Km 46,899
Purchase Together With The Supply Of Heating Oil For Isee Czechowice Dziedzice
Successive Supply Of Heating Oil Intended For Heating Purposes In 2025-2027 For The Railway Line Plant In Gdynia
Non -Planned Current Repair Of External Lighting Devices In Selected Locations In The Operation Of The Railway Lines Department In Bialystok In 2025.
Modernization Of Rooms In The Building Of The Former Et Control Room At St. Ełk, Adaptation Of The Facility For A Shelter And Storage Rooms, Central Heating Replacement
Performing Installation Control At The Railway Lines Department In Poznań.
Delivery Of Track Chokes Zlb-0240/3E-Al
Special Reviews Of Engineering Facilities In Accordance With Id16
Retrofitting Tv Monitoring Devices On Line 207 Toruń Wschodni-Malbork Station Kornatowo Km 34.521
Performing Minor Repair Work In The Field Of Passenger Infrastructure Located At The Railway Lines Plant In Szczecin Divided Into The Following Tasks: 1). Task No. 1- Area Of Operation Of The Szczecinek Operating Section, 2). Task No. 2 - Area Of Operation Of The Koszalin Operation Section.