4467 Live Notices for 방글라데시 입찰
Showing 1 to 20
National Consultant- Project Document (Prodoc) Development
Sc 124681 Ban: Technical Advisor (Ban: Bay Terminal Ppp Project In Chittagong)
Procurement Consultant
Csawm-Wdb-Wd-17/03: Re-Excavation Of Canal Total 34.200 Km In Connection With Philder 55/1 Subproject Under The Patuakhali O&M Division, Bwdb,Potakali.
Csawm-Wdb-Wd-17/02: Construction Of 2 Nos Sluice, 1 No Outlet And Construction Of 1 No. Wmo Training Center In Construction With Plder 55/1 Subproject On Patuakhali O&M Division, Bwdb, Patuakhali
Csawm-Wdb-Wd-17/01: Re-Sectioning Of Embankment 46.160 Km & Slope Protection 0.500 Km In Connection With Philder 55/1 Subproject On Patuakhali O&M Division, Bwdb, Patuakhali.
Periodic Maintenance Programme (Pmp-Roads) Providing Double Bituminous Surface Treatment (Dbst) Work From Ch:-80+062 To Ch:-93+312 =13.250Km Of Bhanga-Bhatiapara- Mollahat-Fakirhat-Noapara Road (N-805) And Double Bituminous Surface Treatment-Dbst Including Other Necessary Repair Works From Ch.20+988M (Majhi Bari) To Ch.32+000M (Katherpool), Ch.47+000M (Tafalbari) To Ch.52+039M (Bogi) And Widening, Strengthening & Surfacing With Dbs-Wearing Course Works From Ch.32+000M (Katherpool) To Ch.38+470M (Rayenda Bridge Approach) Of Signboard-Morelgonj-Raynda-Shorankhola-Bogi Road (R- 773) Under Road Division Bagerhat During The Year 2024-2025.
04 Line Pol Items
02 Line Pol Items
03 Line Pol Items
Tyre With Tube Roadrun Nylon 5.00-12 Ze Ss 14 Ply Pating Four Wheeler Power Trolley
17 Line Mt Spare Parts
11 Line Mt Spare Parts
Blue Zin
(1) Construction Of Open ... Drain At 2 No: Word Got Shahar Mondel House To Kader House Under Puranapoil Up Joypurhat Sadar Jopurhat. (2) Improvement Of Soling Road At 24 No: Word Hanail Mondalpara Dulal Shakhidar House To Shahid House Under Bambu Up Joypurhat Sadar Joypurhat. (3) Improvement Of Soling Road At 5 No: Word Khumaripara Hbb Road To Ataur House Under Bambu Up Joypurhat Sadar Jopurhat. (4) Maintance Of Bambu Union Parishad Road & Dakoration Of Main Gate Under Bombu Up Joypuhat Sadar Joypurhat. More
Major Maintenance Of Nes ... Arabad Ueo Under Nesarabad Upaziladist-Pirjpur. More
Procurement Of Measurin...G Tools For Avr & Sfc In Gtg System Of Haripur 412 Mw Ccpp. More
Urgent Repair Work Inclu...Ding Road Renovation And Installation Of Parking Tiles In The Office Area Of Barguna Pwd Division. More
Renovation Work Of The R...Emaining Road Inside Narsingdi District Circuit House (East North Corner). Fy 2024-25 More
Hessian New Gunnies With... 30 Kg Packing Capacity Manufactured In The Year 2025 Or Latest. 1. Bag Length: 86.36Cm/34 Inch Tolerance: +4Cm -0; 2. Bag Width: 45.72Cm/18 Inch Tolerance: +4Cm -0; 3. Bag Weight: 330Gm/0.73 Pound Tolerance: +6 Percent -2 Percent; 4. Ex-Cloth: 36Inch-10.8 Oz/36Inch (11X12) {Wip (Weight In Proportion) 40 Inch-12 Oz/36 Inch (11X12)}; 5. Porter (Ends/Dm): 11(47) Tolerance: +2 -2; 6. Shots/Ins (Picks/Dm): 12(47) Tolerance: +2 -2; 7. Moisture Regain (Mr Percent): Contract 16 Percent Maximum 17 Percent; 8. Oil Content: 3 Percent Maximum 9. Sewn: Hemmed Mouth Herackle Sewn (Hkl) Side & Bottom+Safety Sewn; 10. Stitch/Dm: Hemming 9-11 Herackle 9-11 & Safety Sewn 9-11; 11. Seam Yarn Count: Hemming 9 Lbs 1 Ply Herackle 9 Lbs 3 Ply & Safety 9 Lbs 2 Ply; 12. Strength (Kg): A. Cloth Breaking Load (Strip Method 10X20Cm): Warp Way- 112 Kg (Minimum) Weft Way- 120 Kg (Minimum) B. Seam Breaking Load (Strip Method 5X20Cm): Warp Way- 34 Kg (Minimum) Weft Way- 36 Kg (Minimum); 13. No. Of Bag Per Bundle: 25 Pcs Tolerance: +0 -0; 14. No. Of Bundle Per Bale: 12 Bundle Tolerance: +0 -0; 15. No. Of Bag Per Bale: 300 Pcs Tolerance: +0 -0; 16. Bale Weight: Net Weight=99 Kg Tolerance: +Acceptable-0 Tare Weight=3Kg Gross Weight =102 Kg; 17. Bale Packing: Flat Packing Bags Wrap In Clean Jute Cloth And Binded With 2(Two) Iron Belt.Centre Name:(Rajbari Sadar Lsd Rajbari-100000 Ambikapur Lsd Faridpur-50000 Boalmari Lsd Faridpur-50000 Tekerhat Lsd Madaripur-50000 Katakhali Lsd Munshiganj-25000 Sreenagar Lsd Munshiganj-25000). More