368 Live Notices for ルクセンブルクの入札
Showing 1 to 20
Us Mission Luxembourg
Us Mission Luxembourg
Microwave Power Sensor Calibration Kit
Screed work
Kayl - Transformation The L'Ecole Way
2544 - Interior Carpentry Work - Construction Of 16 "Lehmkaul" Houses In Dorscheid
6005 - Mono Framework Agreement Association Of Project Management: Sanitation/Polluted Soil Management - Nsm Project In Dudelange
Supply And Installation Of A Provisional Mt Position Equipped To Execute As Part Of The Construction Of A New Sports And School Infrastructure At 1, Rue Mongenast-Servais In Luxembourg-Dommeldange
Transformation Of The School Site In Mertzig
3378_Gros-Oeuvre Closed, Ref. Ae14-5
2079 Global Project Management Relating To The Energetic Renovation Of The Batiment Sis Place Des Bruyeres In Rumelange
9701 - Construction The 95 Logments "In The Smear" Â € ™M-Towel - Travaux, Serreerie It'S Ferrr
Procurement And Logistic Supp. Of Versatile Payload Carrier
2052 _ Eescherschmelz_ Global Project Management Market Relating To The Renovation Of Production And Distribution Of Domestic Hot Water
3379_Gros-Oeuvre Closed, Ref. Ae14-6
5751 - Rests With Waltz À Waltz - Quarter Q7 Northern 5 Bowlims (7,2, 7.3, 7. Davux, 7.5
Waf (Web Application Firewall) Et Load-Balancer
Earthworks: 1,000 M3; Backstage In Crushed/Sand: 890 M3 Coated 250 T; Ecological Paved Surface In Concrete 28 M2; 470 Ml Granite Pavement Line; Granite Border 420 Ml Networks: Creos The Inventories Above Are Preliminary And Possibly Subject To Revision.
Large Of The Work: - Pieux Drilling Diameter 90Cm: 750 M - Reinforcements For Piles: 38 Tb - Prv Pipe Dn1100: 630 M - Reinforced Concrete Pipes Dn800: 100 M - Trench Armor: 3,600 M2 - Trenched Earthworks: 6,000 M3 - Mass Earthworks: 3,200 M3 - Armed Concrete: 1.300 M3 - Reinforced Concrete Reinforcements: 130 To Predictable Start Of Work: January 2026 Duration Of Work: 300 Working Days
Equipment Of A Rain Overflow Basin With: - 1 Throttle Device - 1 Fine Slide Rake - 3 Flushing Buttons - 2 Diving Engine Pumps - Remote Monitoring - Electrotechnical Installations Execution: January 2026 Execution Duration: 225 Working Days Of Trial Operating Time: 65 Working Days