Supply Preparing ceramic insulators for power transformer plant
provide Cleaning the residential area of the General Petrochemical Industries Company
provide Cleaning the departments and facilities of the General Company for Petrochemical Industries
Replacement of the roof of the cooling and cathodic protection workshops at Bab Al Zubair site (maintenance period 365 days from the date of initial acceptance)
Rehabilitation of the well revitalization and stratigraphic examination workshop in Al-Burjisiya
Construction of a building for the morning and shift staff of the Control and Systems Department in the brick warehouse (maintenance period 365 days
Establishing a special optical cable for surveillance cameras in Zubair Warehouse/2
purchase Air Intake Filters Set / 4 Sets
purchase for Oil purifier preparation
purchase for Backhoe loader (brand new)
provide for Preparing vehicles for the Reconstruction Fund for Areas Affected by Terrorist Operations
construction of the Baghdad Martyrs Directorate building in Al-Waziriyah
construction Miscellaneous civil works
supply for Preparing electrical cables for the construction project of 12 tanks in the Al-Kasak refinery / second phase
Comprehensive Maintenance of Central Cooling Equipment for Units Operating at the Rumaila Gas Power Plant
Supply of Air Inlet Filters for Nasiriyah Gas Power Plant and Dhi Qar Combined Cycle Power Plant
Updating the operation and control system for the valves of the ultrafiltration water treatment system for the Sadr Power Plant.
Design, supply, installation, testing and operation of the Industrial Wastewater Treatment Plant for the Second South Baghdad Gas Power Plant
Provision of Preparing and installing two (2) production lines for the seed purification plant
Provision of Reconstruction of Atshana Research Station / Kirkuk