2 Live Notices for South Africa Software Testing Tenders
Showing 1 to 2
The Design, Development, Manufacturing, Supply, Delivery, Off-Loading, Installation, Testing At Site, Drafting Of User Documentation, Training And Commissioning Of The Required Transmission Power System Control And Monitoring System (Tpscm) Infrastructure: Hardware, Software, Cabling And Networking, Required At The Primary Control Centre (Pcc) And The Secondary Control Centre (Scc) Sites Of The System Operator.
To Develop, Maintain And Support Services For The Automation Of Submission Processes (10/1/2025 7:54:58 Am)