Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

The Design, Development, Manufacturing, Supply, Delivery, Off-Loading, Installation, Testing At Site, Drafting Of User Documentation, Training And Commissioning Of The Required Transmission Power System Control And Monitoring System (Tpscm) Infrastructure: Hardware, Software, Cabling And Networking, Required At The Primary Control Centre (Pcc) And The Secondary Control Centre (Scc) Sites Of The System Operator.

ESKOM South Africa has Released a tender for The Design, Development, Manufacturing, Supply, Delivery, Off-Loading, Installation, Testing At Site, Drafting Of User Documentation, Training And Commissioning Of The Required Transmission Power System Control And Monitoring System (Tpscm) Infrastructure: Hardware, Software, Cabling And Networking, Required At The Primary Control Centre (Pcc) And The Secondary Control Centre (Scc) Sites Of The System Operator. in Software Services. The tender was released on Oct 10, 2025.

Country - South Africa

Summary - The Design, Development, Manufacturing, Supply, Delivery, Off-Loading, Installation, Testing At Site, Drafting Of User Documentation, Training And Commissioning Of The Required Transmission Power System Control And Monitoring System (Tpscm) Infrastructure: Hardware, Software, Cabling And Networking, Required At The Primary Control Centre (Pcc) And The Secondary Control Centre (Scc) Sites Of The System Operator.

Deadline - Nov 07, 2025

GT reference number - 119855200

Product classification - IT services: consulting, software development, Internet and support

Organization Details:

  Address - South Africa

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 119855200

  Document Type - Tender Notices

Notice Details and Documents:

Description - notice_title: The Design, Development, Manufacturing, Supply, Delivery, Off-Loading, Installation, Testing At Site, Drafting Of User Documentation, Training And Commissioning Of The Required Transmission Power System Control And Monitoring System (Tp scm) Infrastructure: Hardware, Software, Cabling And Networking, Required At The Primary Control Centre (Pcc) And The Secondary Control Centre (Scc) Sites Of The System Operator.local title:: The design, development, manufacturing, supply, delivery, off-loading, installation, testing at site, drafting of user documentation, training and commissioning of the required Transmission Power System Control and Monitoring System (TPSCM) infrastructure: H

Gt Ref Id - 119855200

Deadline - Nov 07, 2025

Share share

Similar Tenders :

Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database