Demolition And Dismantling Work (Din 18 459); Scaffolding Work (Din 18 451); Drywall Work (Din 18 340); Tile And Slab Work (Din 18 352); Painting And Varnishing Work - Coatings (Din 18 363); Plastering And Stucco Work (Din 18 350); Wallpapering (Din 18 366); Thermal Insulation Composite Systems (Din 18 345);House 1>Security & Construction Site Equipment>Protective Covers Inside - Floors, Stairs, Doors, Windows, Frames And Other Surfaces Approx. 250M2>Protective Covers Outside - Floors, Windows, Doors, Bases And Other Surfaces Approx. 130M2>Core Drillings, Holes And Recesses Of Various Sizes In Walls And Floors Approx Disposal Of All Surfaces, Objects And Other Items In The Bathroom On The First Floor And Toilet On The Ground Floor Approx. 30M2>Demolition And Disposal Of Wallpaper In The Kitchen On The Ground Floor Approx. 30 M2>Dismantling And Storage Of Door Leaves In The Basement, Including Labeling>Scaffolding Work Setting Up, Dismantling And Preparing The Working Scaffolding Outside Approx. 190M2>Finishing And Renovating Etics On Core Drillings New, Decentralized Ventilation System Approx Renovating Wdvs On A New Bell System Approx. 1 Piece>Drywall Work Small Partition Walls And Facing Shells For Enclosures And Pre-Wall Installation. - Bathroom On The First Floor, Toilet Approx. 5 Pieces>Dry Plaster On All Walls In The Bathroom On The First Floor And Toilet On The Ground Floor Approx. 50M2>Recesses, Edge Protection, Soffits, Covers, Renovation Openings, Work On Tb >Dry Ceilings In The Bathroom On The First Floor As Well As The Toilet And Kitchen On The Ground Floor Approx. 30M2> Renovating, Reworking, Filling, All Walls, Bathroom, First Floor And Toilet, Ground Floor Approx. 50M2>Papering And Painting All New Suspended Ceilings, Ground Floor And First Floor Approx. 20M2>Connecting Joints Approx Plastic Membrane Sealing And New Composite Screed Approx. 10M2>Small-Part Base With Plastic Membrane Sealing Approx. 10M>Recesses, Edges, Soffits, Covers, Revision Openings, Attachments Fa >New Window Sills Made Of Natural Stone Approx. 2Pcs>Connecting Joints Approx. 40M>Producing Undercuts And Reinstalling Door Leaves Approx. 7Pcs>Installation Of Surrounding Frames With Door Leaves Approx. 3 Pieces>Final Construction Cleaninghouse 2>Security & Construction Site Equipment>Protective Covers Inside - Floors, Stairs, Doors, Windows, Frames And Other Surfaces" Approx. 250M2>Protective Covers Outside - Floors, Windows, Doors, Bases And Other Surfaces" Approx. 130M2>Core Drillings, Holes And Recesses Of Various Sizes In Walls And Floors Approx. 70 Pieces>Cutting Work And Slotting Work>Demolition And Disposal Of All Surfaces, Objects And Other Items In The Bathroom On The First Floor And Toilet On The Ground Floor Approx. 80M2>Demolition And Disposal Of Wallpaper In The Kitchen On The Ground Floor Approx. 30M2>Dismantling And Storage Of Door Panels In The Basement, Including Labeling> Scaffolding Work Setting Up, Dismantling And Maintaining Working Scaffolding Outside Approx. 120M2>Etics And External Plastering Work Preparing And Renovating Etics On Core Drillings New, Decentralized Ventilation System Approx. 8Pcs>Work On And Renovate Wdvs On New Bell System Approx. 1Pc>Drywall Work Small Partitions And Facing Shells For Casings And Pre-Wall Installation. - Bathroom On The First Floor, Toilet Approx. 5 Pieces>Dry Plaster On All Walls In The Bathroom On The First Floor And Toilet On The Ground Floor Approx. 50 M2>Recesses, Edge Protection, Soffits, Covers, Revi-Openings, Work On The Tb" >Suspended Ceilings In The Bathroom On The First Floor As Well As The Toilet And Kitchen On The Ground Floor Approx. 20M2>Plastering, Painting And Wallpapering Work Renovating, Refinishing, Filling, Wallpapering And Painting The Walls Of The Kitchen On The Ground Floor Approx. 30M2>Renovation, Reworking, Filling, All Walls, Bathroom, First Floor And Toilet, Ground Floor Approx. 50M2>Papering And Painting All New Suspended Ceilings, Ground Floor And First Flo