18 Live Notices for 定位服务招标
Showing 1 to 18
Purchase 1 Pcs. Camera For The County Library "Nicolae Milescu Spătarul" Vaslui
Pro Services. Clinics Proced. Polysomnography
Comprehensive Management Service Of Various Tourist Spaces And Services In The City Of Ávila
Incorporate M-Code And Datalink Interface Capability Into An/Usn-3 Satellite Signal Landing Systems (Ssls)
Iosis-Ng Full-Motion Reflector Antennas
Micro-Water Jet Cutting Machine With Angle Compensation Head
(Provia-Id 969) Delivery And Installation Of Ready-Made Cross-Beat Wall Modules (Qswm) For Train Tunnels
Purchase Medical Equipment Intended To Equip The Bft Section Within The Braila County Emergency Clinical Hospital
Product/Service Quant. Unit Product/Service: Positioner For Handling Parts To Work In Conjunction With 6 Axes Robot Description: Positioner For 2 Axles With Nominal Load Capacity Of 500 Kg For Floor Assembly This System Should Have A Maximum Rotation Time Of 2.5 Seconds On Axis 01 And 3.3 Seconds For A 360 Rotation On Axis 02 The System Must Be Compatible With The Kuka Kr C4 And Kr C5 Command Module, As Well As Contain All Cables And Connections For The Introduction Of Said Module Command The Minimum Accuracy For Both Axes Must Be 0.006 The System Must Have Protection Degree Iec60529 Ip 67 And Minimum Warranty Of 01 A Year 1 Unit Product/Service: Potance Module For Positioning Control Compatible With Command Module Kuka Kr C4 Or C5. Description: Position Power Module For Control Compatible With Command Module Kuka Kr C4 Or C5 This Power Module Should Provide The Necessary Energy And The Control Signals To Robot Servomotors For Motion And Positioning Positions Coupled To The Kr C4 Module Or C5 300M Y Data Cable With Plug/Y Con Plug, T1 T2 Circuit For Industrial Robo Circuit To Robo Industrial For Power Module Installation K4 Or K5 Kr50 R2100 Cable Cable Ksp Cable For Ksp Binding For Power Module Connection 2 Rdc Kr Iontec For Installation Of External Positioner Axles In Kc4 Module Or Kc5 Kuka Kr50 R2100 R2100 R2100 Ksp Cable For Kr50 Positioner Installation Kr50 R2100 Components That Will Be Installed In The Kr50 R2100 Equity System N 663332 1 Unit Product/Service: Installation Of Kp1 V500 V1 External Axle Kit At Kr50 R2100 And Power-Up Of The Equipment. Inclusion In The Mathematical Project And Coupling Description: Installation Of Kp1 V500 V1 External Axle Kit At Kr50 R2100, Including Power Up Of The Equipment Inclusion And Mathematical Coupling This Service Will Be Installed The Outer Axes Of The Dkp500 Positioner 2 Hw On The Kr50 R2100 Manipulator 1 Unit
Incorporate M-Code And Datalink Interface Capability Into An/Usn-3 Satellite Signal Landing Systems (Ssls)
Incorporate M-Code And Datalink Interface Capability Into An/Usn-3 Satellite Signal Landing Systems (Ssls)
Frip/Upol - Laser Interferometric Measuring System
"Development And Introduction Of Intelligent Transport Systems (Its) And Integrated Digital Solutions To Improve The Efficiency And Efficiency Of Public Transport In Haskovo"
Study Of Legal, Financial, Technical And Organizational Analysis This Mission Must Make It Possible To Respond To The Orientations Desired By The State While Dealing With The Questions Of Epcis And Members Of The Steering Committee And In Particular (Non -Exhaustive List): - What Concretely The Missions Defined In 1 °, 2 °, 5 ° And 8 ° Of I Of Article L211-7 Of The Code Of The Environment Which Delimit The Gemapi? What Are The Non -Gemapi Missions Corresponding To The Challenges Of Basins Such As Streams And Soil Erosion, Rainwater Management (Item 4); - What Don'T They Contain? - What Are The Possibilities Of Organizing The Transfer And Delegation Of These Missions (Possible Flexibility, Damability Of Missions, Etc.)? - Among These Which Are Exercised On The Territory, Which Scale (S)? Which Are Not Yet Exercised? And Who Exercise Them? - What Are The Missions Of An Eptb/Potage? - How To Organize A Coherent And Effective Exercise Of Skills And Missions With Regard Notably To The Prevention And Management Of Floods? - Are The Scenarios Mentioned By The State And The Epcis For Improving Governance Respond To The Objective Of Better Water Management And In Particular The Missions Of Gemapi? Are They The Most Efficient To Meet The Challenge (S) Of The Resilience Of Our Territories? - Can We Meet The Different Scenarios With The Structures In Place? How (Creation, Transformation, Merger, Membership, Etc.)? The Territory Of The Study Includes The Watersheds Of The Boulonnais, The Canche, The Authie And The Somme. It Covers The Managing Structures Of Watersheds (Eptb And Edge) As Well As The Epcis Intervening On These Basins. 1– Firm Edge: Phase 1: Diagnosis Of Exercise Of Gemapi Skills More Broadly Those Linked To The Great Water Cycle And The Preservation Of The Resource (Runoff, Fight Against Soil Erosion, Animation Of Sage, Papi) On The Scale Of The Perimeters Of The Boulonnais Watersheds, Canche, Authie And Held Phase 2: Analysis Of The Perspectives And 1St Stage Scenarios: This Analysis Will Be Based On The 4 Scenarios: - Eptb Somme-Canche-Authie-Eptb Canche-Authie-Boulonnais-Eptb Canche And Authie-Eptb Somme Canche Authie Boulonnais 2Nd Step Depending On The Positioning Of The Epcis And The Structures Concerned: The Steering Committee Will Be Able To Determine The 2 Scenarios Deemed To Be Deepened. 2– Optional Tranche 2.1- Development Of Statutes And Identification Of Procedures According To The New Organization Retained 2.2- Additional Services
Positioning Systems And Travel Safety
Magnet Joint Qualification System (Magnet Jqs) - A Joint Qualification System
Magnet Joint Qualification System (Magnet Jqs)
Provide Satellite Monitoring And Tracking Services, As Well As The Acquisition Of Global Positioning Devices (Gps)