67 Live Notices for 水主要翻新建筑招标
Showing 1 to 20
Effective, Optimiz. And Reduced Infr.Canal Granado
Provision of River Boulevard, Richmond Water Main Upgrade
Az6587 – Request For Tender – Head Contract (Hc-1 2021) (Design And Construct) – Est06796 – Anglesea Paterson Project
Rehabilitation Of Orbel Water Supply System.
Rehabilitation Of The Clos D'Estaing Discharge Post
Rehabilitation of the Clos d'Estaing pumping station
Open Procedure, For The Conclusion Of A Framework Agreement With A Single Economic Operator For Lotto, For The Assignment Of The Conservative Maintenance And Efficiency Works Of The Network Infrastructures Of The Integrated Water Service And Of The Construction Of New Connections, In The Municipalities Of The Macro Southern Area Of The Regional Territory, Lasting 36 Months, Divided Into 5 Lots. Ref. App. Pa 11/2025.
Refurbishment Of Town Hall With Cultural Center: Planning Services Civil Engineering And Water Stop
Dn400 Conduct Replacement On 25 De Abril Street, Charneca De Caparica
Replacement and renewal of drinking water lines in various streets in the Mit Okba area (first phase)
Refurbishment Of Town Hall With Cultural Center: Planning Services Civil Engineering And Water Stop
This Project Aims To Improve The Drinking Water Distribution System In The Municipality Through A Series Of Actions That Optimize The Efficiency Of The Network, Guarantee The Quality Of The Supply And Reduce Losses For Breakdowns And Leaks. The Drafting Of This Executive Project Responds To The Need To Access Funding Through Subsidies Of The Catalan Water Agency (Aca) For The Improvement Of Municipal Hydraulic Infrastructures. In Order To Take Advantage Of These Grants, The Project Has Been Structured Into Four Different Actions, Each With A Specific Impact On The Supply Network: Lot 1. Network Mallate In The Nucleus Of La Galera And Installation Of Flow Meters With A Teleleurate System, And A New Impetus From The Granges Deposit To La Cometa Space. Lot 2. Implementation Of Tele -Reading In The Municipal Network Through The Installation Of New Intelligent Counters And Regulation Of Pressure And Sectorization Of The Network In The Field Of Merlès. This Document Describes The Technical Characteristics Of The Project, The Previous Studies Carried Out, The Hydraulic Calculations That Base It, As Well As The Construction Procedures And The Management Of Waste Management, Safety And Health, And Quality.
Refurbishment Of Outdoor Pool - Carpentry Work Facade
Refurbishment Outdoor Pool - Locksmith Work
Cold Water Maintenance Refurbishment And Replacements
Refurbishment Of Water Pipe "On The Basement Width"
Announcement - General Guideline, Standard Regulation Open Procedure (Construction Work) Center For Democracy And Diversity - Redesign And General Refurbishment Wastewater Water, Gas Systems - Approx. 20 Sanitary Objects (Toilet, Wt); - Approx. 350 M Drinking Water Pipe (Stainless Steel, Metal Composite Tube); - Approx. . More
supply and implementation of a water supply transmission line to the city of Bayza and its affiliated villages from the Durudzan Dam
supply and implementation of a water supply transmission line to the city of Bayza and its affiliated villages from the Durudzan Dam
Construction 681 - Refurbishment Of Sanitary North Strand - Sanitary Facilities