9 Live Notices for 电压招标
Showing 1 to 9
Dzp/Zp/22/Ifpan/2025/Jrk Delivery Of The "Lock-In" (Lock-In Amplifier) With Boxcar (Boxcar Averager) Function-Set (Part 1) And Delivery Of Two Homodine Voltmeters (Lock-In Amplifiers) (Part 2)
Dzp/Zp/22/Ifpan/2025/Jrk Delivery Of The "Lock-In" (Lock-In Amplifier) With Boxcar (Boxcar Averager) Function-Set (Part 1) And Delivery Of Two Homodine Voltmeters (Lock-In Amplifiers) (Part 2)
Purchase Of Equipment For The Implementation Of The Construct 2 Construct 2 Of The Construct 2 Of The Construct 2.
Slization Still System Trafasic Community Measure 0-440Vca Communication 3G/4G/Ethernet.
Calibration Of Three (3) Portatil Patterns Radian Research Model Rd-33.
Spare Parts Sequence - E2.3X Tx131
Supply Equipment Equipment And Software In Figos (20) Departments
Electrical items (Flygt ENM-10 Liquid level regulators, NPS Changeover Devices (AC Control supply undervoltage relay 415VAC), Transformers (Control Gates), Panel Fan (U11-15 Unit Computer Panels), Programmable Digital Timer, Contactors, Remote Station Push Button, Copper Strips, Charger spares, VaiLight LED Bulbs, LED Tube Lights, LED Flood lights, Top plugs Black, Insulation Tape, Batteries, Cable Lugs, Omicron Accessories, LC-LC multimode fiber optics and associated conduits, Supervision relays, Power Supply Modules (Governor Panel), IO modules, Governor panel spares, Analogue Gauges, Voltmeters, Ammeters (Aux pumps), KPS Transducers (Current, Voltage, Frequency), Magnetic float level switches, Pressure Transmitters, Carbon brushes for generators, Fiber glass filters for NPS generators, Air filter brackets for exciter panels, Plug in power control relays for NPS Units, Converter fan contactors, Converter fan manual motor starter, Earth Leakage MCB, Input Coupling Unit, Field flashing control fuses 10A, Field flashing control fuses 20A, Field flashing control fuses, Crowbar Current Transformer, Crowbar Resistor, Field flashing resistors, Converter fans for NPS Exciters, Converter fans for KPS Exciters, Surge Arresters, Capacitors for Exciters, Dual diodes, Optical fiber connector polishing kit, Bridge rectifier, Current Shunt Resistor, Excitation Service Level Agreement, Fibre Glass Ladders, Fibre Glass Scafolding, Contact Cleaner, Spare 132kV HV insulators for the 132kV Substation, Maintenance of the Oil regeneration plant + Provision of spares, Aluminium Clamps, Copper Brazing Rods BCU-P2, Brazing Ribbons, M24 PAL lock nuts, RS PRO Soldering Station 90W 220V, Materials for Motor Repair, Glass Tape, Flexible copper strip 1x 50mm, Plastic Filler Gauges for Rotor Air Gap measurement, R+C108otor Overhaul Consumables, Planned Outage Consumables)
Set Of Ammeters And Voltmeters For Wag-7