40 Live Notices for 阀门测试招标
Showing 1 to 20
Fm-200 Clean Agent And Pre-Action Fire Suppression System – Inspection
Valve,Float,Aircraf
Supply, installation instructions, setup and testing of Bypass Valves, Globe Valves (needle valve type)
Supply of Bypass Valves, Globe Valves (Needle Valve Type) including Installation Instructions, Setup, and Testing
Fci Atlanta Fire Suppression And Check Valve Inspection Requirement
48--Valve,Globe
Valve,Regulating,Fl
Maximator Valve And Spare Parts
Nellis Afb Paving Idiq
Procurement Of Safety Valve Testing Services Safety Press District
Water Valve And Air Valve Replacement And Repairs (Multiyear Contract)
Design, Supply, And Installation Of A Liquid Nitrogen Storage &Distribution System
Ups Modular
Overhaul Activities In Thermal Power Plant 2025 Service For Specialized Labor
Supply, Delivery, Installation, Testing And Commissioning Of 1000 A Motor Operated Butterfly Valve Assembly With Control System All Complete At Desander Of Chameliya Hydropower Station, Balanch, Darchula.
Valve, Linear, Direct
Control Laboratory Testing Services Of Materials And Products Used For The Installation Of Multiple Asphalt Layers
Mechanical Framework
Respirator: Purpose: Anti-Erosol, With An Exhalation Valve, A Conditional Protective Factor Of Pkd: Up To 50, Semi-Line, Protection Class: Ffp3, Material: Pressed Fabric Filter, Spunbond, Marking On A Testing Respirator, Use Time: 40-50 Hours, Oxygen Mask Disposable (For Adults).
Provision Of Repair And Maintenance Of Water Pump System Of Ocd Ro1 Building For Cy 2025