46 Live Notices for 涡轮工程招标
Showing 1 to 20
2025-05 - Klondike Park Road Well Site, Reservoir And Pumping Station
Retehnologization Che Stejaru. Retehnologization Ha1 ÷ H4 And Central Installations
Retehnologization Che Stejaru. Retehnologization Ha1 ÷ H4 And Central Installations
103422 Lp - Rfp - Early Execution Works For Avalon Combustion Turbine At Holyrood Generating Station
Works Of The Execution Project Related To The Modifications Of The Hvac System Of The Turbine Building Of The Santa María De Garoña Nuclear Power Plant
Removal/Disposal Of Accumulated Dust From All Equipment, Pipeline, Ducts, Walls, Floors, Turbine Hall, Boiler House, Main Control Building, Network Control Building & Other Buildings Of Barapukuria 2X125Mw Power Plant.
Fire Station Access Rd & St Marys Tad 2 Water Treatment Plant Project
Maintenance Service And Provision Of Pdrs For Diesel Engines Of The Mohammedia 3*100Mw Gas Turbine Power Plant
Re-Blading, Turbine Blade Repair, Mechanical Cleaning, Overhauling And Dynamic Load Balancing Of Abb Tpl 67 C34 Turbocharger Of Baghabari 50 Mw Peaking Power Plant.
Ersatz 20Bar-Turbine
Ersatz 20Bar-Turbine
(A) Yearly Cleaning Of All Equipments, Pipeline, Ducts, Walls, Floors, Washrooms, Turbine Hall, Boiler House, Main Control Building, Network Control Building & Other Buildings Etc. Of Barapukuria 275 Mw Power Station (Unit -3). (B)Yearly C.
Supply, Installation And Repair Works Of Sandwich Panel Walls In Turbine Hall Of 450 Mw Ccpp (South) Plant Of Apscl.
S70B Seahawk Helicopter Spares
Pine Street Well Rehabilitation & New Chemical Feed Building
Construction Of An Energy Block Of Approx. 475 Mw On Natural Gas In Turceni («Cccg Turceni») - Design, Engineering, Acquisition, Execution Of Works, Commissioning And Long -Term Maintenance Services
Retehnologization Che Stejaru. Retehnologization Ha1 ÷ H4 And Central Installations
Construction Of An Energy Block Of Approx. 475 Mw On Natural Gas In Turceni («Cccg Turceni») - Design, Engineering, Acquisition, Execution Of Works, Commissioning And Long -Term Maintenance Services
Retehnologization Che Stejaru. Retehnologization Ha1 ÷ H4 And Central Installations
"The Construction Of An Energy Block Of Approx