30 Live Notices for 挖沟招标
Showing 1 to 20
ATG-2025-0011: Project for the construction of the elevated bridge over the N-525, kilometer point 295+000, intersection with the Camino do Sueste-Vía da Plata-Camiño Mozárabe, kilometer point 50+724, Bendoiro-Lalín, in Pontevedra. File 2025/057
Renewal Of The Electrical Cabinet Of The Mole Wastewater Treatment Plant And Creation Of Gutters For The Passage Of Networks Between The Premises And The Valve Manholes.
Renewal Of The Electrical Cabinet Of The Mole Wastewater Treatment Plant And Creation Of Gutters For The Passage Of Networks Between The Premises And The Valve Manholes
Demolition And Dismantling Work In Accordance With Din 18 459 - 2534/2025
Manual Earth Excavation 67 Mc
Construction Services For The Replacement Of Fire Alarm Systems For The…
Outdoor Facilities
Deployment Of Fiber Optic Around Aguilar And High
Vrd Works For The Deployment Of An Optical Fiber Network.
28.14.0000.829.02.001.25/Re
Renovation Cable Of Private Interest (Cip) Of The South West Berre Sector
Vrd Works For The Deployment Of A Fiber Optic Network
Outdoor Facilities - Middle U. Transport Facilities
Renewal Work Of A Diameter 800 Mm Diameter
Renewal Work Of A Diameter 800 Mm Diameter In Méry-Sur-Oise
Demolition Work
Bima, Brück 2, Building 24, Basic Management And House Connection
9166 Design And Build Rail Systems Contractor For Dart+
Garden/Landscaping Work - Recording And Recovering Of (Un) Sealed Outdoor Area - Accompanying Landscape Construction Work For Renewal Outdoor Lighting
Garden/Landscaping Work - Recording And Recovering Of (Un) Sealed Outdoor Area - Accompanying Landscape Construction Work For Renewal Outdoor Lighting