7 Live Notices for 污水室招标
Showing 1 to 7
Performance Of The Second Part Of The Works As Part Of The Task "Failure To Flood The Area Of Jarosław By Changing The Hydraulic Parameters Of The Pot. Szewnia In Km From 16+115 To 16+761"
Renovation Of The Sewage Collector
670 Hiring Of The Maintenance Service Of Sewerage Systems Defalling Chambers And Water Elevation Of The Dr Children'S Hospital. Roberto Del Río [Njd]
Changing Sewage Treatment Technology
Expansion Of The Flörsheim - Ba2- Ve22 Process Technology
Street Drain Cleaning In The City Area
Waghodia Ugd Ii Under Sjmmsvy: Working Survey, Soil Investigation, Design Of Underground Drainage Project. Work Including Providing, Supplying, Lowering, Laying, Jointing, Testing And Commissioning Of Rcc Np3 Pipes For Sewer Collecting System - Gravity Mains And Di Pipes For Rising Main Pipeline, Construction Of Sewage Pumping Station (Sps), Construction Of Sewage Treatment Plant, Supplying, Erecting, Testing & Commissioning Of Pumping Machineries At Zone Level, Construction Of Inspection Chambers & House Connection, Rcc Road, Compound Wall, Electrification Work And Sewer Cleaning Equipment Etc. For Underground Sewerage System For Waghodia Town Project, Work Including Operation And Maintenance Of 2 Years For Sewer Collecting System, And 7 Years For Sewage Treatment Plant, Taluka: Waghodia, District: Vadodara.