41 Live Notices for 河壁建筑招标
Showing 1 to 20
M3J9 Sprayed Concrete
Demolition Services M3J9
Muck Away Haulage
Realization Of The Deepening Work Of A Water Operating Drilling For The Supply Of Drinking Water Within The Municipality (The Compulsory Visit Of Places
2025 Fujian Mianhuatan Hydropower Development Co., Ltd.
Preparation Of Investment Projects And Exercise Of Copyright Supervision For The Realization Of Investment Intentions Of Dupnitsa Municipality In Lots. "
Reformed Works Project For Reconstruction Of Walls In The Major Torrent, Barona Puente Section, In The Municipality Of Sóller.
Construction Of River Training Work From Phulbari Of Badigad Khola In Badigad Rural Municipality Ward No. 6 Up To The Boundary Of Daga Khola In Ward No. 5, Baglung
WALL CONSTRUCTION PROJECT AT TAI PAK KUNG TEMPLE, SUNGAI MENYAN, SERIAN, UPKJ (Works) Class: F (Earth)
Construcción De La Obra Civil Para La Protección Hidráulica Del Acceso De La Subestación Eléctrica Zapata Oriente Bco. 1 Ubicada Sobre Carretera 186 Villahermosa-Chetumal, Localidad De Emilio Rabasa E
Disclosure Hueberbach, Stage 1
Disclosure Hueberbach, Stage 1
Repair, Conditioning And Punctual Reconstruction Of The Collapsed Sections Of The Soterrado Section Of Son Armadams, Located Between Access To Garages Of The Urbanization "Gardens Of Son Armadams" And C/ Almirall Cervera. Tm Palma
"Dental Studies (Pip) For The Cherni Osam River Dam", Lovech District
Work Supervision Of The Project "Const. Of Deep Wells For The Capture Of Water In The Province Sud Yungas" (Third Call)
Renewing, Amending And Rehabilitating The Ghaliba Dam In The Asir Region
Reformed Works Project For Reconstruction Of Walls In The Major Torrent, Barona Puente Section, In The Municipality Of Sóller.
Hire Technical, Financial And Administrative Consulting To Carry Out Structural Design Studies For The Construction Of A Retaining Wall On Pacho Mario Avenue
Guadaiza Collector Works. New Separative Network Pedro Alvarado Street With The Existing Network Cristobal Colon
Wuhan Xinzhou District Water Affairs And Lake Bureau Competitive Consultation Announcement On The Construction Phase Of The Drainage And Water Control And Flood Control Renovation Project In The Chengnan Area Of Xinzhou District, Wuhan City