82 Live Notices for 植物工程设计招标
Showing 1 to 20
Establishment of a 10 MW Solar Photovoltaic (SPV) Power Plant in Rashid Equestrian and Horseracing Club (REHC)
4601/2025/5300Establishment Of A 10 Mw Solar Photovoltaic (Spv) Power Plant In Rashid Equestrian And Horseracing Club (Rehc)
General Sports Authority Grid-Tied Solar PV power plant with a capacity of 3 MW under CAPEX model
25-269 - Consulting Engineering Services For The Iona Island Wastewater Treatment Plant Northeast Lagoon Infill
Afg25Eoi003 - Looking For Vendors For Construction Related Rosters (Construction Of Vertical Structures And Construction Of Horizontal Structures)
4120--Mobile Chiller
Refurbishment Nikolaisaal Potsdam Electroplanization For Event Technology
Establishment Of A 10 Mw Solar Photovoltaic (Spv) Power Plant In Rashid Equestrian And Horseracing Club (Rehc)
Engineering, Procurement, And Fabrication For A Pilot-Scale Hydrothermal Liquefaction Plant
Hvc - Battery Energy Storage System (Bess) - Alkmaar
Integral Supply Of Equipment And Materials, Engineering, Manufacturing, Assembly And Commissioning Of The Microrred (Dc Bus) To Connect Different Green Hydrogen Production Systems And Energy Storage Of The Cubillos De Cubillos Del Sil Technology Development Center, Within The Framework Of The Prtr, Financed By The European Union, Next Generation
Hvc - Battery Energy Storage System (Bess) - Alkmaar
Purchase Of Fire Extinguishing System Design And Project Execution Supervisory Services
Mewa/Re/2025/T1General Sports Authority Grid-Tied Solar Pv Power Plant With A Capacity Of 3 Mw Under Capex Model
Reoi For Establishing Ltas For Wash Infrastructure, Operation And Maintenance
General Sports Authority Grid-Tied Solar Pv Power Plant With A Capacity Of 3 Mw Under Capex Model
Procurement Announcement Of Survey And Design Service Projects For The Expansion Of Sanshui Plant In Huguan County And Water Supply Pipeline Laying Engineering
Object Planning Building Performance Phases 1-9
Comprehensive Implementation Of The Wind Farm Construction In The Epc+F Formula - Execution Of Works Of The Design, Electrical, Assembly, Construction Industries Together With Funding Ensuring
C2025-02 - Galt Wwtp Primary Clarifiers Upgrades (Contract 3)