9 Live Notices for 炼油厂建筑招标
Showing 1 to 9
Improved Power Plant In The Area
Provision for Construction of a 300m reservoir, bulk pipelines and associated infrastructure near muldersvlei
Preparing the gas flare system (high pressure) at Noor Gas Separation Station (establishing a flare system for gas associated with crude oil) within a period of (545 days).
Supply of drilling services for water wells
Connally Drive Construction
Sylvan Road North Sidewalk Construction
Outdoor Pool Rehabilitation
Bid 25-0111-5 Walthour Slope Stabilization Project
Cleaning And Repairing Of Tank Body And Water Line Of 02 Nos. Water Tanker (Wt-6 And Wt-7) Of Amrapa