58 Live Notices for 灌溉渠道建设招标
Showing 1 to 20
Second Phase Of Shallow Ishikawa Agricultural Irrigation Project: Nakaizumi Trunk Line Drainage Channel Renovation (Part 6) Construction
Y--Nv Ash Meadows Nwr Cry Sprngs Restore
Irrigation Channel Construction; In (La) The Florida District Of Vegueta, Huaura Province, Lima Department With Cui N ° 2632073 - Execution Of Work: Construction Of Irrigation Channel; In (La) The Florida District Of Vegueta, Huaura Province, Lima Department With Cui N ° 2632073
Safety Work Of The Banks Of The Northern Alpine Canal.
Maintenance Of Irrigation Scheme Boks-Dragoc-Kullaj Village
Safety Work Of The Banks Of The Northern Alpine Canal
Safety Work Of The Banks Of The Northern Alpine Canal
"Selection Of Contractors For Carrying Out Construction And Installation Works Of Hydromelioration Facilities Owned By Irrigation Systems Ead, Sub -Measure 4.3" Investments For Development, Modernization Or Adaptation Of Agricultural And Forest Infrastructure "Of Measure 4.
Provision for the continuation of hydro-agricultural developments in lowlands to secure farmers and reduce pressure on mountain slopes and hillsides (MP)
Securing Work Of The Banks Of The Northern Alpine Canal In The Communes Of Saint Rémy De Provence And Eyragues.
Securing Work Of The Banks Of The Northern Alpine Canal In The Communes Of Saint Rémy De Provence And Eyragues.
Securing Work Of The Banks Of The Northern Alpine Canal In The Communes Of Saint Rémy De Provence And Eyragues.
Inv Pt+Execution 2/2025 - Elaboration Of Design Documentation D.T.A.C.+D.T.A.D.+D.T.O.E.+P.T.+D.D.E.+Technical Assistance From The Designer According To H.G. No.907/2016, In The Package With The Execution Of The Works At The Investment Objective -2 Lots
Works For Rehabilitation Of "Rehabilitation Of Ajameti Irrigation System In Zestaponi Municipality".
Rehabilitation Works Of "Kalauri Emergency Water On The Lower Alazani Irrigation System".
Second Phase Agricultural Irrigation Project In The Northern Part Of Tsugaru: Sandyama Trunk Line Drainage Channel Renovation (Part 2) Construction
Refurbishment Of Matthias-Grünewald-Gymnasium Tauberbischofsheim
Contracting The Work Included In The Project "Improvement And Modernization Of The Irrigation Network Of The Irrigation Community Of The Riudecanyes Reservoir, Salou Drain (5Th Phase) (Tm De Reus)", Signed By The Collegiate Agronomist. 1,222 And According To The Benefits And Functionalities Detailed In The Particular Technical Prescriptions.
Inv Pt+Execution 2/2025 - Elaboration Of Design Documentation D.T.A.C.+D.T.A.D.+D.T.O.E.+P.T.+D.D.E.+Technical Assistance From The Designer According To H.G. No.907/2016, In The Package With The Execution Of The Works At The Investment Objective-3 Lots
Inv Pt+Execution 2/2025 - Elaboration Of Design Documentation D.T.A.C.+D.T.A.D.+D.T.O.E.+P.T.+D.D.E.+Technical Assistance From The Designer According To H.G. No.907/2016, In The Package With The Execution Of The Works At The Investment Objective-3 Lots