193 Live Notices for 石膏招标
Showing 1 to 20
Twenty-Six Years Old, Buys A G.O.D. Budget.
In 2026, The Central Gypsum System Of The Central Bowery Hospital Replaced The Old Control Panel.
We'Re Working On The Cross-Op Of The Gypsum And The Connections.
I'M Going To Give You An E-Mail On How To Do An Electrical Job To Remove Asbestos From The Main Gypsum.
Purchase of current maintenance works Cleaning the ceiling from the unusable smoothing layer and emulsion Coating the ceiling with a smoothing layer with "gypsum-based, rich in additives that increase product usability, thin, white color" solution Painting the ceiling 2 times with emulsion Dismantling the part of the wallpaper at a height of 1.5 m along the perimeter of the auditorium. Repairing with rich, high-adhesion, thin, white" solution. Painting the wall twice with emulsion.
Purchase Of Ace 1000 Gypsum Centrifuge Knives For Pge Giek S.A. Bełchatów Power Plant Branch
Acquisition Of Hardware Materials
Gnzc2026-G1-990948-Jgjd
Rfq-Wb-0065-0-26 - Building Supplies For Local Suppliers Only
Plastering And Painting Work For The 1St Ba Main Building As Part Of The Interior Renovation Including Fire Protection And Digital Pact Of 2 Existing Buildings At The Bad Vilbel City School, Frankfurter Str. 85, 61118 Bad Vilbelgeneral Building Descriptionthe General Building Description Can Be Found In The Attached File 08_26-5-228_Baubescription_Fristen_Putzmalerarbeiter.Pdf.Locationthe School Grounds With The The School Building Is Centrally Located In Bad Vilbel. The School Grounds Are Located On A Slope And Are Generally Sloping Or Modeled By Levels Built Into The Terrain. It Is Surrounded By The Streets Frankfurter Straße, Albanusstraße, Bergstraße And A Non-Motorable Path Along The School Grounds Between Frankfurter Straße And Bergstraße. The School Is Located Within A Residential Area. Access To The School Grounds Is From Bergstrasse Via An Access Road Located There. There Is Pedestrian Access To The School Grounds In The Area Of The Non-Motorable Connecting Path Between The Streets Frankfurter Straße And Bergstraße. The School Buildings Themselves, Which Are Affected By The Measures, Are Located In The Upper Area Of The Property; The So-Called Main Building Was Built Here. The So-Called Old Building Was Built In The Middle, Slightly Lower Down. There Are Other Buildings On The School Site Itself, But These Are Not The Subject Of The Planned Measures. The Access To The Main Building Is In A Northerly Direction Leading To The Schoolyard. A Second Entrance To The Main Building, Known As A Side Entrance, Is Located On The East-Facing Side Of The Building. This Entrance Also Faces The Schoolyard.The Postal Address Isstadtschule Bad Vilbelfrankfurter Straße 8561118 Bad Vilbelthe Work In The List Of Services Includes The Execution Of The Interior Plastering Work (Lime-Gypsum Plaster) As Well As The Subsequent Wallpapering And Painting Work.The Wallpapering Work Includes Execution With Fiberglass Fabric Wallpaper.The Painting Work Must Be Carried Out In Accordance With The Color Concept.Main Parts Of "Plastering And Painting Work":- Cover Floor Area: 1,140.00 M² - Cleaning Of Wall Surfaces: 2,564.00 M² - Primer Masonry: 2,245.00 M² - Lime-Gypsum Plaster: 2,245.00 M² - Fiberglass Mesh: 1,911.00 M² - Painting Walls: 1,911.00 M² - Component Connections, Acrylic Sealant (Colored): 3,380.00 M - Final Documentation: 1.00 Psch - Final Cleaning: 1.00 Pschexecution Times: Cleaning Work: From Approx. 49Th Week 2026 To 5Th Week 2027 Wallpaper And Painting Work: From Approx. 17Th Week 2027 To 20Th Week 2027 Repairs: From Approx 2027 To Week 25, 2027 Since The Award Procedure Has Only Just Started, Execution Will Probably Start Later, I.E. This Means That You Will Probably Receive The Request To Start Work In Accordance With Form 214 Immediately After The Contract Has Been Awarded. We Ask You To Take This Into Account When Preparing Your Offer And Participating In The Procurement Process. The Binding Period Ends On December 23, 2026.
In 2026, A Public Bid Was Made For A Nursing Home Supply Company With Gold Gypsum Love.
Materials For Various Repairs And Maintenance Of Facilities And Equipment In Kpd Prilep And Small Inventory (Locksmith Materials, Electrical Materials, Lighting, Materials For Plumbing And Sewage, Building Materials, Sanitation, Paints, Etc. Products, Glues, Insulating Materials, Gypsum Products, Sheets And Profiles) - Repetition Of Procedure For Procurement Of Electrical Materials
Acquisition Of Hardware Materials
[Ld] Infrastructure Improvements For The Elderly Guápiles, Cecuida Nursing Home.
Plaster Supply For Type A Constructions
Sussar! Glosser! Gyp! 3Rd Tool Construction! Remikon!
Reconstructing A Bicycle With A Gypsum.
Proposal For Gygostechnis - Chalcoglyptic- Tourism Projects
Proposal For Gygostechnis - Chalcoglyptic- Tourism Projects
Drywall Workdrywall Work (Din 18 340);Drywall Work - Preparatory Measureso Setting Up The Construction Siteo Construction Scheduleo Work And Assembly Planningo Approx. 3,200 M2 Clean Flooro Approx. 4,700 M2 Protective Covers - Wallso Walls Without Fire Protection Requirements? Approximately 1000 M2 Of Metal Stud Walls? Create Approx. 45 Door Openings? Create Approx. 155 M Of Screed Support? Approx. 120 Pieces Of Drywall Work? Create Approx. 42 Pieces Of Tga Openings? Various Connections To Walls With Fire Protection Requirements? Approx. 500 M2 Metal Stud Walls F90? Approx. 50 M2 Metal Stud Walls F30? Create Approx. 26 Door Openings? Working On Approx. 160 Pieces Of Drywall? Produce Approx. 290 Pieces Of Tga Openings? Various Connections And Reinforcements Or Wall Coverings With A Substructure? Approx. 250 M2 Of Wall Coverings? Approx. 150 M Of Soffit Clothing? Working On Approx. 170 Pieces Of Drywall? Produce Approx. 112 Pieces Of Tga Openings? Approx. 110 Pieces Of Inspection Flaps? Various Connectionso Wall Coverings Acoustics? Approx. 640 M2 Wall Covering Acoustics? Approx. 42 Pieces Of Drywall Work? Approx. 48 Pieces Of Inspection Flaps? Create Approx. 48 Pcs Of Openings? Various Connections Or Attachment Shells? Approx. 280 M2 Of Facing Shells? Create Approx. 6 Pieces Of Tga Openings? Approx. 6 Pieces Of Inspection Flaps? Approximately 1 Hour Of Making A Door Opening Or Dry Plastering? Approx. 20 M2 Dry Plaster Ceilings Without Fire Protection Requirements? Approx. 40 M2 Suspended Ceiling Plasterboard. Curved? Approx. 20 M2 Suspended Ceiling Inclined Plasterboard. Fleece Reinforcement? Approx. 10 Pieces Of Inspection Flaps? Approx. 30 Pcs. Make Openings? Various Connections Or Suspended Ceilings/Ceiling Linings With Fire Protection Requirements? Approx. 300 M2 Suspended Ceiling F90? Approx. 290 M Connection To The Suspended Ceiling? Approx. 80 M2 Sloping Roof / Ceiling Inclined F90 Calcium Silicate Plate? Approx. 22 M2 Self-Supporting Suspended Ceiling F90 Calcium Silicate Plate? Approx. 40 M Edge Connection? Approx. 15 M Of Support Clothing F90 Calcium Silicate Pl.O Acoustic Ceilings? Approx. 45 M2 Ceiling Covering. Plaster Perforated Plate? Approx. 240 M2 Ceiling Covering. Inclined Plaster Perforated Plate? Approx. 280 M Frieze? Approx. 60 M2 Seamless Mineral Acoustic Ceiling. Acoustic Panels Acoustic Filler? Approx. 60 M Ceiling Apron On The Side? Make Approx. 12 Openings? Approx. 4 Pieces Of Inspection Flaps? Approx. 295 M2 Suspended Ceiling Gypsum Perforated Panels Acoustics? Approx. 340 M Frieze? Approx. 340 M Ceiling Apron On The Side? Approx. 340 M Free Ceiling End? Create Approx. 116 Pcs Of Openings? Approx. 20 Pieces Of Inspection Flaps And System Grid Ceilings? Approx. 330 M2 System Grid Ceiling Mineral Plate 600 X 600 Mm? Approx. 65 M2 System Grid Ceiling Mineral Plate 600 X 1200 Mm? Approx. 600 M Wall Connection Profile? Approx. 170 M Frieze In Different Widths? Approx. 161 Pieces Of Mounting Frame For Recessed Lights? Approximately 200 Pieces Of Openings Are Made Using Wood Wool Ceiling Sails? Approx. 150 M2 Delivery And Installation Of Acoustic Ceiling Sails? Approx. 350 M Edge Trim Made Of 30/100 Mm Mdf Wood-Based Panel With Real Wood Veneer? Approx. 50 Pieces Of Round Cutouts? Approx. 15 Pieces Of Ceiling Reinforcement In The Area Of Built-In Parts Or Route Cladding? Approx. 105 M Ceiling Sail Tape With Side Upstands? Approximately 70 Pieces Of Openings Must Be Made. Approx. 10 M Ltg Claim? Approx. 20 M2 Ltg-Bekl? Create Approx. 15 Openings? Approx. 15 Pieces Of Inspection Flaps For The Acoustic System Of The Lecture Hall? Approx. 135 M2 Acoustic Suspension Ceilin