26 Live Notices for 地面稳定招标
Showing 1 to 20
New School Campus In Heffingen - Lot 1: Terns, Stabilization, Buried Networks, Outdoor And Geothermal Arrangements
Ortenau Klinikum Offenburg (85038/70/72), New Building Clinic Building (20-30) / Muz (20-10) / Evz (20-20), Ve1009 (Kg 321) Special Creation With Drilling Pile Work And Vibrating Compression
Execution Of The Construction Project For The Stabilization Of The Embankment In The P.K. 16+000 Of The Ap-636 Highway, Bergara Sense.
Execution Of The Construction Project For The Stabilization Of The Embankment In The P.K. 16+000 Of The Ap-636 Highway, Bergara Sense.
Execution Of The Construction Of The Construction Project Protections Against Detachments To The Points At Risk Of Instability On The Side Of The Bv-1489 Road (Pk 1+000-1+400, Me). Tm Figaró-Montmany
Wall Repair Works On The Coastal Path Section 2 "The Chimney- Beach Bella" In Estepona
Bratislava - Flood Protection, Activity 3, Bratislava - Karlova Ves District, Vydrice'S Leadership To The Danube - Subsoil.
Containment Contract Of The Banks Of Ribeira Das Figueiras - Arruda Dos Vinhos
Kavgara Landslide Remediation In Mz Kikaci
Soil Studies, Diagnosis And Project Manager, For The Absorption And Stabilization Of Ground Movements On The "La Redoute" Subdivision
Soil Studies, Diagnosis And Project Manager, For The Absorption And Stabilization Of Ground Movements On The "La Redoute" Subdivision
Bratislava - Flood Protection, Activity 3, Bratislava - Karlova Ves District, Vydrice'S Leadership To The Danube - Subsoil.
Mineshaft Remediation
Soil Studies, Diagnosis And Project Manager, For The Absorption And Stabilization Of Ground Movements On The "La Redoute" Subdivision
Comfortment Of Sliding Areas By Nailed Works, Repair Of Work And Sanitation
9167 Contract For The Design And Build Of Spencer Dock
Slope Stabilization In Bárcena Mayor (T.M. Los Tojos-Cantabria), Charged To The European Agricultural Fund For Rural Development (Feader)
Slope And Wall Stabilization Works By Soil Nailing, On The Illetas Paseo Esq. C/ Architect Francesc Cases.
Boundary Stabilisation Works - 5 Ash Close, Willand
Strengthening Work By Solid Injection - Creche Sur Sandillon.