Toggle Offcanvas
...
 
频转换器招标

频转换器招标

查看频转换器招标,RFP和合同。自2002年以来,竞标具有最佳,最全面的招标平台的易于使用的频转换器招标。 对于各种规模的公司来说,招标转换器招标非常有利可图。招标当局和私人公司释放了数千份价值数百万美元的合同,用于采购转换器。

全球招标是致力于招标和政府合同的最大平台。全球台人拥有超过20年的招标业务经验,提供了最广泛,最可靠的招标/RFP/合同数据库。该平台汇总了公共和私人资源的合同,与超过50万买家的庞大网络建立了联系。我们细致的过程采用了先进的人工智能,涉及从十万来源收集信息。然后,将数据智能分类为数千个子类别,以方便过滤并以用户友好的格式显示,以快速理解。

除了招标信息外,我们还提供深入的频率转换器市场分析,出价咨询服务以及对顶级竞标者和获奖者的见解。 立即注册以立即访问无限的频转换器招标,高级搜索过滤器,市场分析,行业趋势,招标培训和24/7客户支持。

33 Live Notices for 频转换器招标

Showing 1 to 20

Converter,Frequency
country United States
posting date22 Oct 2025
deadline04 Nov 2025
Supply And Installation Of Two Hp Pumps With Its Panel
country Panama
posting date22 Oct 2025
deadline05 Nov 2025
Frequency Converter Ca600-4T185G/200P
country Taiwan
posting date21 Oct 2025
deadline22 Oct 2025
Acq. Of A Batch Of Spare Parts For Abb Medium Voltage Frequency Converters For The Rhai.
country Argentina
posting date21 Oct 2025
deadline06 Nov 2025
Converter,Frequency
country United States
posting date17 Oct 2025
deadline24 Oct 2025
Converter,Frequency
country United States
posting date17 Oct 2025
deadline24 Oct 2025
Supply Of Frequency Converters And Frequency Converter Parts
country Kosovo
posting date17 Oct 2025
deadline01 Nov 2025
59--Converter,Frequency
country United States
posting date16 Oct 2025
deadline30 Oct 2025
Electromotors Controlled With Frequency Converters
country Kosovo
posting date09 Oct 2025
deadline24 Oct 2025
Frequency Converter Goods Purchase Work
country Turkey
posting date06 Oct 2025
deadline30 Oct 2025
16--Frequency Converter, In Repair/Modification Of
country United States
posting date01 Oct 2025
deadline30 Oct 2025
New Frequency Converter - Fubia - Biasca
country Switzerland
posting date24 Sep 2025
deadline05 Dec 2025
New Frequency Converter - Fubia - Biasca
country Switzerland
posting date22 Sep 2025
deadline05 Nov 2025
Sps-10988 Heating Pump Replacement At Hmp & Yoi Polmont
country United Kingdom
posting date25 Jun 2025
deadline24 Jun 2026
A Static Frequency Converter Including Transformers In Biasca.
country Switzerland
posting date11 Jun 2025
deadline05 Jan 2026
A Static Frequency Converter Including Transformers In Biasca.
country Switzerland
posting date10 Jun 2025
deadline05 Jan 2026
A Static Frequency Converter Including Transformers In Biasca.
country Switzerland
posting date10 Jun 2025
deadline05 Jan 2026
Plan Schedule - 400910860262697094100044001 - Frequency Converter
country Uzbekistan
posting date22 Oct 2025
deadline22 Oct 2026
Electrical items (Flygt ENM-10 Liquid level regulators, NPS Changeover Devices (AC Control supply undervoltage relay 415VAC), Transformers (Control Gates), Panel Fan (U11-15 Unit Computer Panels), Programmable Digital Timer, Contactors, Remote Station Push Button, Copper Strips, Charger spares, VaiLight LED Bulbs, LED Tube Lights, LED Flood lights, Top plugs Black, Insulation Tape, Batteries, Cable Lugs, Omicron Accessories, LC-LC multimode fiber optics and associated conduits, Supervision relays, Power Supply Modules (Governor Panel), IO modules, Governor panel spares, Analogue Gauges, Voltmeters, Ammeters (Aux pumps), KPS Transducers (Current, Voltage, Frequency), Magnetic float level switches, Pressure Transmitters, Carbon brushes for generators, Fiber glass filters for NPS generators, Air filter brackets for exciter panels, Plug in power control relays for NPS Units, Converter fan contactors, Converter fan manual motor starter, Earth Leakage MCB, Input Coupling Unit, Field flashing control fuses 10A, Field flashing control fuses 20A, Field flashing control fuses, Crowbar Current Transformer, Crowbar Resistor, Field flashing resistors, Converter fans for NPS Exciters, Converter fans for KPS Exciters, Surge Arresters, Capacitors for Exciters, Dual diodes, Optical fiber connector polishing kit, Bridge rectifier, Current Shunt Resistor, Excitation Service Level Agreement, Fibre Glass Ladders, Fibre Glass Scafolding, Contact Cleaner, Spare 132kV HV insulators for the 132kV Substation, Maintenance of the Oil regeneration plant + Provision of spares, Aluminium Clamps, Copper Brazing Rods BCU-P2, Brazing Ribbons, M24 PAL lock nuts, RS PRO Soldering Station 90W 220V, Materials for Motor Repair, Glass Tape, Flexible copper strip 1x 50mm, Plastic Filler Gauges for Rotor Air Gap measurement, R+C108otor Overhaul Consumables, Planned Outage Consumables)
country Uganda
posting date01 Sep 2025
deadline30 Jun 2026
Frequency Converter - So20944812 - 08/20/2025
country Uzbekistan
posting date21 Aug 2025
deadline20 Aug 2026

Share Share this page