1324 Live Notices for 挖掘招标
Showing 1 to 20
Geres Proximity Terrains Reaming Work By Societe Rabat Animation And Developpement
Monument Rehabilitation At Piedmont Dam
57/52/2/24/033 - Master Plan Hasselt 2026: Renewing Of Tracks, Railways, Overhead Line And Signaling (L35/L21A).
New Construction Of A Leisure, Sports And Communication Center On Walperloh In 98574 Schmalkalden
Refurbishment Cornichonstrasse 17-19 In Landau In The Palatinate, Earth And Sewer Work And Renovation Basic Pipes (84/2025 Vob Gml)
2025_1019_Bl_13.555.001_Ö Repair Of Passports Dn1000 - Dollendorf And Waldorf
Taunusstein Outdoor Pool And Superstructure Work, Foundations And Paving Work, French French Excavation, House Launches.
Mount Saint Helens Sediment Retention Structure Crest Raise
"Snc La Chaussee Sommeliers" Construction 30 Logements Collectifs Et 22 Maisons À La Chaussée-Saint-Victor (41) Lot 22 Espaces Verts Et Clotures
Construction Pits
Re-Excavation Of Haridoa River From Sakurghat Bridge To Kathbagan Bridge (From Km. 9.110 To Km. 9.860 = 0.750 Km.) & Removing Water Hyacinth At Haridoa River From Km 20.000 To Km. 40.500, Total 20.500 Km To Combat The Impact Of Climate Change,.
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Excavation Of Pond/Reservoir With Leveling, Dressing And Compaction Of Excavated Soil To Embankment At Any Upazila Under Project Area
Excavation Of Pond/Reservoir With Leveling, Dressing And Compaction Of Excavated Soil To Embankment At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area
Re-Excavation Of Irrigation And Drainage Khal/Canal With Leveling, Dressing And Compaction Of Excavated Soil To Embankment And Construction Of Outlet Structure (6 Nos Per Km) On The Both Side Of Embankment Of Khal/Canal At Any Upazila Under Project Area