2663 Live Notices for 排水作品招标
Showing 1 to 20
Rennovation Of Halton Village Hall
New Water And Drainage Points For Barraders At Palma De Mallorca Airport
Rfq2025-06Asphalt1 - Construction Services For Asphalt Renewal At St Vincent.
W25C 03Bg - Overflow, Drainage And Culvert Improvements
Work Of Deconstruction Of The Old Town Hall And Construction Of A Covered Hall
Tz.262.9.2025 Construction Works Related To The Implementation Of Tasks Entitled: Task 1. Renovation Of The Pre -Insulated Heating Network Ul. Jesionowa, Supplying Buildings Ul. Wiśniowa 5,9,11,13. Replacement Of Pre -Insulated Drainage Valves Dn 125 In The Well Ul. Jesionowa/Marszałkowska Staszica Towards Ul. Sienkiewicza - Replacement Of 4 Knees With Knee Muffs Folded On The Knees Pre -Insulated Prefabricated.
Package No. 02: Construction Of Repair Works Damaged Background, Road Surface, Drainage System And Traffic Safety System Of Km12+600 - Km15+00 Yen Bai - Khe Sang Street (Dt.163), Yen Bai Province
Tz.262.9.2025 Construction Works Related To The Implementation Of Tasks Entitled: Task 1. Renovation Of The Pre -Insulated Heating Network Ul. Jesionowa, Supplying Buildings Ul. Wiśniowa 5,9,11,13. Replacement Of Pre -Insulated Drainage Valves Dn 125 In The Well Ul. Jesionowa/Marszałkowska Staszica Towards Ul. Sienkiewicza - Replacement Of 4 Knees With Knee Muffs Folded On The Knees Pre -Insulated Prefabricated.
New Construction Of The Bexbach Emergency Control Center - Earthworks, Drainage Channel Work
New Building Swimming Pool Realschule Regenstauf - Sanitary Technology
Expansion Of National Road No. 92 Near M. Wilkowo Consisting In The Demolition Of The Existing And Construction Of A New Viaduct Over Pkp With Access
The Object Of The Contract Is To Pave Water Steps From The Section Of The Path Of Can Rubi To Can Pla, With The Formation Of Longitudinal Drains (Concrete Gutters) And Transversal, As Well As Sections Of Concrete Pavement Where The Slopes Or Turns Make It Difficult To Circulate And Have Greater Maintenance Than In The Rest Of The Flatter Sections. It Is Also Planned To Act On A Timely Basis On The Section Of The Can Riera De Ciuret Path, In The Field Of The Campsite, With The Paving Of A Closed Bend And The Section Of Pavement And Gutter That Remains To Be Made Between Two Paved Sections. Specifically, In This Second Phase, The Following Actions Provided For In The Project Are To Be Executed: - The Section F Completely. - The Section H, The 280 Ml Of The Remaining Gutter To Execute And 235 Linear Meters Of Concrete Pavement. - The Section I, The Formation Of The Drainage Work - The Section J Completely.
Public Works Management Maintenance For Drainage And Drainage Management, Including On The Side Of The Road In Peach City, Takahyo City, 114 Years (Opening Contract)
Provision of SOLING WORKS,DRAINAGE WORKS INCLUDING HUME PIPE
Proposed Clearing And Desilting Works At Paya Selabak Block C Controlled Drainage Scheme Sg. Senga Bintulu
Proposed Clearing And Desilting Works At Paya Selabak Block B Controlled Drainage Scheme Sg. Sundak Bintulu
Proposed Clearing And Desilting Works At Paya Selabak Block A Controlled Drainage Scheme Sg. Gelam Bintulu
Proposed Clearing And Desilting Works At Sarupai Drainage Scheme, Bintulu
Proposed Clearing And Desilting Works At Semanok Block D Drainage Scheme Sg. Setiam, Bintulu
Proposed Clearing And Desilting Works At Semanok Block C Drainage Scheme Sg. Seterus, Bintulu