142 Live Notices for 桥梁结构招标
Showing 1 to 20
Framework Agreement - Inspections Of Sensitive Land And Metrology Works Of Art Structures And Sensitive Land Works On The Aprr, Area, Aliae, Adelac Networks
5010042152 - Modernization Of The Beira Alta Line, Santa Comba Section - Mangualde
Rft 2025R43-2554-01 - Cr 43 Slope Stabilization
Rehabilitation Of Road Route Composed Of County Roads Dj 412 A, Dj 412 C And Dj 601
Special Inspection Of The Superstructure And Tendon Concrete Beams
29 Day (S) 12 Hours (S) 23 Minute (S) 17 Second (S)
Analysis Of The Existing State Of Bridges And Tunnels With A Proposal For Remediation Measures
Integral Control For The Assembly, Disassembly And Maintenance Of Modular Metal Bridges, Through The Exhaustible Amount System, For The Structures By The National Roads Institute -
Execution Works Within The Project: "Modernization Of Road Infrastructure Of Local Interest In Barsana Commune, Maramures County"
Assembly, Disassembly And Maintenance Of Modular Metal Bridges, Through The Exhaustible Amount System, For The Structures In Charge Of The National Roads - Invias Institute (Selection Phase (Pre
Bau Main Performance Eü Euloer Straße Forst (Lausitz), Str. 6205 Km 21.25
Hwk_Spgk_Wiederbau Of The Ahrtalbahn, Railway Route 3000 - Walporzheim To Ahrbrück
Ern Eü In Km 7.630 Ü. D. Bahnhofstr. In Raubling, Route 5702 Rosenheim - Kufstein
Hwk_Spgk_Wiederbau Of The Ahrtalbahn, Railway Route 3000 - Walporzheim To Ahrbrück
Fe 15.0730/2025/Rrb - Potential To Increase Sustainability In Concrete Bridge Construction
Environmental Coordinating Market For The Sélune Renaturation Project
Fe 15.0730/2025/Rrb - Potential To Increase Sustainability In Concrete Bridge Construction
Engineering And Regeneration Professional Services Framework
20Fei45125 Bim Sachsenmagistrale, Residual Measures, Part Of Dresden Hbf - Freital Ost
Bau Main Performance Eü Euloer Straße Forst (Lausitz), Str. 6205 Km 21.25