19 Live Notices for 压载建筑作品招标
Showing 1 to 19
Execution Of Works For Investment: "Asphalting Roads Of Local Interest In Dumbrava Commune Prahova County"
At Fni (Feni) Section :- Construction Of Ballast Protection Wall At K.M.66/2-4 (Dn Side)= 656'-0'', K.M.66/7-9 (Dn Side)= 656'-0'', K.M 67/1-3 (Dn Side)= 1312'-0'' K.M. 67/5-7 (Dn Side)= 656'-0'', K.M. 68/6-7 (Dn Side)= 318'-0'', Total =32.
At Cml (Cumilla Section) : Construction Of Ballast Protection Wall At Km 137/6-7 To 149/0-2 (Up Line) Total= 5576'-0" Rft In Between Section Aswr-Mamt Station With Other Allied Works As Per Approved Drawing.
At Cml (Cumilla Section) : Construction Of Ballast Protection Wall At Km 144/6-9 To 153/0 (Up & Dn Line) Total= 5576'-0" Rft In Between Section Lmi-Cml Station With Other Allied Works As Per Approved Drawing.
At Ssae/Works/Kyto Section: Construction Of Bank Protection Wall (1200 Feet Length) At Km 361/0-3 To 362/0-1 And Repairs To Cess & Bank By Earth Filling From Railway Land Including Of Ballast Wall At Both Approach Of Bridge No-229 (3X4.
Execution Of Works Within The Project "Landshaft Cycling, Remetea Commune, Harghita County"
Replacement Of The Ballasting Piping Of The Form Of Radoub N ° 2 At The Port Of Brest.
Hard Track System, Rupperswil
Framework Agreement For Track And Superstructure Work In The Network Of Rhein-Neckar-Verkehr Gmbh
Design Services, Technical Assistance From The Designer And Executions Of Works For: "Work To Bring To The Initial Technical State Of Some Sectors Of County Roads And Bridges Affected By Dangerous Hydro-Meteorological Phenomena During 48 Calendar Months"
GE: Gl. 839/829; WE: W803, W807, W808; Construction site logistics, ballast cleaning, welding, tamping and straightening work as required, loading, pre- and post-construction, and connection work, maintenance services, safety services, construction site equipment, construction-related services
At Fni (Feni) Section :- Construction Of Ballast Protection Wall At K.M.43/6-9 (Up Side)= 984'-0'', K.M.45/8-46/0 (Dn Side)= 656'-0'', K.M 46/7-8 (Dn Side)= 328'-0'' K.M. 47/2-3 (Up Side)= 328'-0'', K.M. 47/6.
At Stk-Lkm Section :- Construction Of Ballast Protection Wall At K.M 41/9-42/2 (Dn Line) =600Rft, At K.M 43/6-9(Dn Line)=900Rft Total=1500Rft (As Per Drawing No. Ce/E-10249) And Providing Channel Cutting Of Hilly Water Diversion At K.M41/1-2(Dn) I.
Terraining Track Gera Langenberg - Refurbishment Of Track System - Soft
27948 Contracting Works Of The Railroad And Its Accessories
27948 Contracting Works Of The Railroad And Its Accessories
27948 Contracting Works Of The Railroad And Its Accessories
Paap-Comuna Moldovenești- 2025
Provision Of Construction Of Ballast Less Track For Line 1,2 And 3 Of Abu Road Yard Of Ajmer Division