152 Live Notices for 机场照明系统招标
Showing 1 to 20
Const. Pavimento Zona Norte Distrito 3 (Pavimento Flexible Otb 27 De Mayo)
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Providing & Installation Of Security Flood Lighting System At Apron Side And Car Park Area At Cox’S Bazar Airport
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Supply, Installation, Testing & Commissioning Of Perimeter Lighting System For Dvor, Bandaranaike International Airport, Katunayake
Procurement Of Different Type Spare Parts For Runway Papi Lighting System At Saidpur Airport.
2Nd Competitive Consultation Announcement Of The Lui Liang City Administration For The Maintenance Of The Airport Road Attachment Lighting Project
Replacement Of Security Lighting System I/C Other Related Works For Runway-34 East Side Area At Jashore Airport. Code No 100.
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PERIMETER LIGHTING SYSTEM FOR DVOR, BANDARANAIKE INTERNATIONAL AIRPORT, KATUNAYAKE
Starkstromve-Ba1-07 Starkstromstarkstromthe Subject Of The Tender Is The High-Voltage Systems As Part Of The Comprehensive Renovation And Redesign Of Hall B Mitte And The Adjacent Areas "Avenue" And "Boulevard" In Terminal 1 Of Frankfurt Airport. The Project Includes The Fundamental Renewal Of The Electrical Infrastructure Including Energy Distribution, Security Lighting, General Lighting, As Well As Other Technical Building Equipment. The Project Area Extends Over Levels E02 To E04 With A Total Area Of Around 16,000 M². The Execution Is Carried Out In Sections In The Existing Building While The Terminal Is In Operation And Requires Close Coordination With The Expansion And Technical Maintenance Trades Working In Parallel As Well As The Operational Requirements Of The Airport. As Part Of This Tender, The Electrical Engineering Installations Will Essentially Be Completely Renewed. The Scope Of Services Includes In Particular The Replacement Of The General, Safety And Security Lighting Sub-Distributions (Av/Sv/Sibe) Including The Partial Renewal Of The Supply Lines From The Low-Voltage Main Distributions (Nshv). In Addition, The Lighting Systems And The Entire Electrical Installation From The Sub-Distributions Onwards Must Be Rebuilt Across The Board. In The Outdoor Area, The Scope Of Services Also Includes The Adaptation Of The Lightning Protection System, The Installation Of General And Safety Lighting For Escape Routes As Well As The Production And Operation Of The Construction Power Supply In The Apron Area. To Better Estimate The Scope Of The Project, The Dimensions Of The Essential Components Are Listed. - 16 Distributors (Av/Sv) To Be Replaced Including The Gls Components - 5 Substations (Sibe) Incl. Approx. 470 Escape Signs And Emergency Lights - Approx. 1550 Lighting Fixtures Mainly Consisting Of Downlights And Diffuser Lights As Well As Approx. 580 Meters Of Line Lights - Approx. 2000 Meters Of Av Route And 1150 Meters Of Sv Route - Approx. 125,000 Meters Of Cables/Wires In Addition, The Construction Electricity Must Be Delivered To The East And West Aprons, Various Installations Such As Switches, Sockets And Electrical Connections, As Well As Potential Equalization And The Renewal Of The Lightning Protection System On The Roof. The List Is Not Complete But Is Intended To Provide An Overview Of The Scope Of The Project. Planned Start Of Execution: 2Nd Quarter Of 2027Planned End Of Execution: 4Th Quarter Of 2030
[Pa] Sole Source Sousaphones Iup
Supply, Delivery, Installation And Calibration Of Various Navigation Aid Equipment: Papi For The Two Runway Thresholds (Precision Approach Path Indicator) And Runway Lighting System
Hardening Of The Engineering Depot Square With Dual-Use Technical Infrastructure For Evacuation And Rescue Transport At The Airport In Suwałki, In The Design And Build Mode
Maintenance And Associated Works Of The Tbm - Tbs - Qse Baggage Handling Facilities At Paris-Charles De Gaulle Airport.
Maintenance Of Tbe (Tri Bagages Est) Baggage Processing Facilities And Associated Works At Paris-Charles De Gaulle Airport.
Maintenance And Associated Works Of The Tbm - Tbs - Qse Baggage Handling Facilities At Paris-Charles De Gaulle Airport