44 Live Notices for Poland Power Transformers Tenders
Showing 1 to 20
Replacement Of Mv/Lv Transformer Stations: Task 1 - Piastowo 4 No. 51393, Task 2 - Strzelno Gs No. 50773, Task 3 - Rogowo Jeziorna No. 50559, Task 4 - Żnin Leśna No. 50800, Task 5 - Żnin Dworcowa No. 50765.
Construction Of A 15/0.4Kv Transformer Station, A 15Kv Connector Along With 15Kv And 0.4Kv Network Connections In The City Of Gorzów Wlkp. Ul. Poznańska, S-2023-17570
Zp/Zo/40/2025 Adaptation Of The 15/0.5 Kv Transformer Station "Wola Uhruska Symetrik" Ul. 1 Maja 49, 22-200 Wola Uhruska, Up To Connection Capacity 200 Kw
Tyski Hub Of The Green Economy
Development Of Technical And Legal Documentation For The Modernization Of The 110/15 Kv Transformer Station In Błonie Commune. Common
Construction Of A Consumer Transformer Station To Power Electric Bus Chargers
Reconstruction (Replacement) Of The Existing Transformer Station 15/0.4Kv S-1882 "Gorzów Zamet" (Design Works) S-2025-17143
Construction Of The Zksn Cable Connector Along With Restoration Of Power Supply To The Consumer Transformer Station No. 9772589 In Czarna Wieś/Kąkolewo
Operational Replacement Of 15Kv Cables No. 508, Transformer Station No. 0711 "Jasna 49" - Transformer Station No. 0682 "Rydla 30" And No. 526, Transformer Station No. 0817 "Rydla 21" - Transformer Station No. 0659 "Rydla Techniczny"
Operational Replacement Of Two 0.4V Cables From Transformer Station No. 0106 "Łaziebna" - Cable Junction Wk 8 No. 0622 Staromłyńska - Łaziebna
Construction Of A 15 Kv Mv Cable Network, A 15/04 Kv Container Transformer Station And A 0.4 Kv Low Voltage Lv Network To Power A Single-Family House Estate In Wełna, Commune. Rogowo - Implementation In The "Design-Build" Mode
Construction Of A 15/0.4Kv Transformer Station, A 15Kv Connector Along With 15Kv And 0.4Kv Network Connections In The City Of Gorzów Wlkp. Ul. Poznańska, S-2023-17570
Construction Of A Consumer Transformer Station To Power Electric Bus Chargers.
From Gorzów; Reconstruction Of The 110/15 Kv Gpz Jedwabie Power Station (Design + Construction) S-2025-01237
Ir.271.37.2025 Construction Of An Sn-20 Kv Cable Line With A 20/0.4Kv Pole Transformer Station To Power The Sewage Treatment Plant In Modlikowice
Construction Of A 15 Kv Mv Cable Network, A 15/04 Kv Container Transformer Station And A 0.4 Kv Low Voltage Lv Network To Power A Single-Family House Estate In Wiecanowo Commune. Mogilno - Implementation In The "Design-Build" Mode
Delivery Of Transformers – Stage 10
Construction Of The Lv-0.4Kv And Sn-15Kv Power Grid Together With The Mv/Lv 15/0.4Kv Transformer Station In Ziemomyśl B.
Delivery Of Two Container Transformer Stations Stk-1, Stk-2 In Olkusz
Dok-Pk30% Preparation Of Formal And Legal Documentation For The Construction Of The Mv Cable Line Of The Rsm Relation Całowanie (Multidecor) - Sobienie Ii And The Modernization Of Selected Mv/Lv Transformer Stations With The Extension Of The Lv Line To The First Stations - In The Commune. Sobienie-Jeziory And Commune Karczew