Similar tenders from other countries.
Showing 1 to 20
Providing Highly Efficient And Continuous Engineering Services For Open -Cycle Gas Turbines (Second Stage) At Al Sabya Station To Generate Electrical Power And Water Distillation
714912460 - Ppa/005 - Marine Gas Turbines - Uk1 Pipeline Notice
Maintenance Service And Provision Of Pdrs For Diesel Engines Of The Mohammedia 3*100Mw Gas Turbine Power Plant
Turbine Equipment And Custodianship Services
Service Contract For Major And Minor Repairs Of Gas Turbine Engines Nsn#2835-01-180-0452, Models; 3800232-1-1, 3800232-1-2, 3800232-1-3, 3800232-1- 4, On The Aviation Ground Power Unit (Agpu).
Dv-1600/25-Kt-Tth -The Lubricant Analysis For Gas Turbines
Maintenance Of 7Ha Gas Turbines And Tubes In 114-115
Insurance Of The Evn Group In Austria As Of October 1St, 2025 To 01.10.2028 (With Options Until 01.10.2033)
Supply and Delivery of Air Inlet Filters for Frame 6541 Gas Turbines at DES Power Station
Refilling Of Gas Cylinders & Co2 Tanks For Gas Turbines Including H Station Bop At Generation Division
Service Contract For Major And Minor Repairs Of Gas Turbine Engines Nsn#2835-01-180-0452, Models; 3800232-1-1, 3800232-1-2, 3800232-1-3, 3800232-1- 4, On The Aviation Ground Power Unit (Agpu).
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Supply, Installation, Operation and Maintenance of Combined Cycle Gas Turbine Project (3600 MW) at Al-Nuwaiseeb - Phase 1
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Preventive, Predictive, Corrective And Regulatory Maintenance Service Of Air Conditioning, Heating, Health Hot Water Production, Legionellosis, Solar Thermal And Gas Energy, And Their Annexed Elements, Installed In The Various Municipal Units And Facilities In The Municipality Of Viladecans.
Spare parts for the chemical injection system for the combined cycle gas turbines, phase 1, at Al-Zour South Station
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS