33 Live Notices for South Africa Water Treatment Tenders
Showing 1 to 20
Notice Of Cancellation: Tender 8/2/1/Umh1274-23/24 Supply And Installation Of Security Fence At Mzingazi Water Treatment Plant For The City Of Umhlathuze By:18 August 2025
Tongaat Water Treatment Works Functional Upgrade
Upgrade And Refurbishment Of Buffels River Water Treatment Works
Tongaat Water Treatment Works Functional Upgrade
SUPPLY, INSTALL AND COMMISSION NEW COMPLETE DELIVERY MANIFOLD AT PEDDIE WATER TREATMENT WORKS HI LIFT PUMP STATION.
Upgrade And Refurbishment Of Buffels River Water Treatment Works
Cancellation Letter - Supply And Delivery Of Laboratory And Water Treatment Plant Chemical Reagents
Re-Issue Of The Supply And Delivery Of Laboratory And Water Treatment Plant Chemical Reagents.
Supply, Delivery, Offloading And Dosing Of Clarification Chemicals For Biological Treatment For Concentrated Cooling Water System At Lethabo Power Station For A Five (5) Year Period On An “As And When Required” Basis.
Notification Of Awarded Camden Power Station For Water Treatment Plant Chemical For As And When Required Basis For The Period Of 3 Years At Camden Power Station.
REPAIR AND MAINTENANCE OF COALN FIRED BOILERS,STEAM AND CONDENSATE RETICULATION, WATER TREATMENT FOR BOILERS_2
The Assessment Of The Waste Water Sludge For Darvil, Ixopo And Howick Waste Water Treatment Works
Supply, Delivery, Offloading And Dosing Of Clarification Chemicals For Biological Treatment For Concentrated Cooling Water System At Lethabo Power Station For A Five (5) Year Period On An “As And When Required” Basis.
Appointment Of A Service Provider For The Design, Supply, Installation, And Commissioning Of The Borehole Water Treatment System, Including Maintenance And Support For A Period Of Five (05) Years With The Option For Further Renewals At Sentech Head Office.
Provision for Deployment of solar photovoltaic plants on Namwater’s land near Von Bach Dam treatment plant to power the Von Bach–Windhoek water supply
Provision for Upgrade and Expansion of Villiersdorp Water Treatment Works – Phase 2
Notification Of Awarded Camden Power Station For Water Treatment Plant Chemical For As And When Required Basis For The Period Of 3 Years At Camden Power Station.
Supply, Delivery, Offloading And Dosing Of Clarification Chemicals For Biological Treatment For Concentrated Cooling Water System At Lethabo Power Station For A Five (5) Year Period On An “As And When Required” Basis.
Repairs on Pump Ramp in Augrabies Falls National Park
Upgrade And Expansion Of Villiersdorp Water Treatment Works – Phase 2