Similar tenders from other countries.
Showing 1 to 20
General Contractor: Construction Work, Civil Engineering Work, Interior Work
Internal And External Upgrade Works To Accommodation Buildings Following Site Survey
Demolition And Reconstruction Of A Building Of 6 Dwellings 4 Place Vaillant Couturier In Fresnes Sur Escaut
Vtg - New Building, Suggested Behind Ventilated Facade
25-035532 Luttung And Daemmurmung Stadt U Lkr Rgb
New Fire Station - Functional Work (G130_Ve355)
Refurbishment Stadthaus Apolda, Am Stadthaus 1, 99510 Apolda - Lot 25 - Painting Work
State Office For Monument Preservation And Archeology (Lda), Window And Facade Renovation, Including Measures On Fire Protection And Accessibility - Kke 410 - Hls (Shl 232-25)
Periodic Examination And Examination Of High Voltage (Electrical Insulation) Equipment And Means For Work
Dining And Social Club Repairs
Rv 180 Medication
School In Bergmannsfeld, Erasmusstr. 44-46, 45279 Essen, Pavilion Dismantling
Roof Renovation Gescher-Dyk School
Scroll Work, University Of The Saarland, Homburg Campus, New Prosekture Preparation, Preparation Of Anatomy As Well As Fields Of Biophysics And Physiology
Product/Service Quant. Unit Product/Service: Microprocessed Mufla Oven 6.7L Up To 1200 ° C With Ramps And Levels Description: Microprocessed Digital Muffle Oven With Internal Volume Of 6.7L, Ramps And Levels; Ambient Temperature Work Capacity Up To 1200 C; Command Panel With Switch/Off Switch And Light Indicator; Automatic Time And Temperature Controller With Pid Digital Display; 4 -Digit Led Control; Resolution Of 1 C; Temperature And Process Time Indication; Heating And Level Ramp Configuration; Left Programming; Thermal Insulation Of High Efficiency In Insulating Bricks And Compacted Ceramic Fiber; Front And Upper Holes For Gas Output And Decompression; Uniform Distribution Of Heat; 4000W Power; 220V; External Cabinet With Sae 1020 Carbon Steel Sheet With Anti -Corrosive Treatment And Electrostatic Painting; Internal Camera In Ceramic Resistant To Thermal Shocks; Power Cord; Kanthal Wire Resistance; Type K Temperature Sensor; Rbc/Inmetro Calibration Of Equipment 1 Unit
Purchase And Delivery Of The Lifting Executive Team
Framework Agreement Relating To The Annual Maintenance And Renovation Work Of The Various Campuses Of The University Of Paris-Est Créteil Val-De-Marne In 11 Separate Lots.
Accessibility Work (Adapt) Of The Afpa Center Of Beaumont
Cold And Thermal Insulation Work On Operating Systems
Technical Insulation / New Construction Fire Station Löschzug Olsberg-Bigge