19 Live Notices for Vietnam Boilers Tenders
Showing 1 to 19
Provide Sets Of Boiler Damper Control Pi, Charcoal Crusher And Credibility For The Burner Surveillance Set
Check The Boiler Pressure Pipe
Xl1 - Construction Of Electrical System For 2 Incubators And 4 Boilers.
Hire Consulting Services To Make A Feasibility Study Report For The Item Upgrading The Boiler Water Supply Power Pump System To Increase The Load Capacity Of The Machine From 35%Ro To 50%Ro And Can Operate Synchronously With The Main Boiler Water Supply Pumps Of Thai Binh 2 Nm.
07Ptv-Scl-2025: Providing Repair Services-Boiler Systems And Auxiliary Systems Of S3 Duyen Hai S3 Duyen 3 Expansion
Purchase of tools for boiler maintenance at workshop U40
Approving The Adjustment Of The Lcnt Plan For Some Bidding Packages Under The Project: Repairing Facilities Of The Work Blocks + 3 -Storey A2 Treatment And Boiler House Of Traditional Medicine Hospital In Bac Giang Province (Now Bac Ninh Traditional Medicine Hospital)
Plan For Selecting Contractor For Purchase Estimation: Procurement Service Provided, Installing Boiler Gas Treatment System
Repair And Maintenance Of Mechanical Boiler Stove In 2025
Repairing The Kitchen Boiler System Of The Female Divergence No. 2
Approving The Plan To Select Contractors Of Science And Technology Services "Research And Use Cfd Simulation (Computational Fluid Dynamics) To Optimize The Operation And Control Of The Boiler At Vung Ang 1"
Repair The Kitchen Boiler System Of The Nam Dien Division No. 2
Service Of Providing Labor Materials For Labor To Repair And Replace The Steel Structure System And Corrugated Iron Roof Of The No. 1 Fuel Storage, Industrial Boiler - Power Plant
Processing Service Of Manufacturing Scratch Chains, Supplement Salt 553.Ev.079 And Salt Recovery Chain Set 553.Ev.088 At The Boiler Recovery - Power Plant
Processing Service According To The Sound Reduction Box Of The Fan 721.Fa.066 + 067 At The Boiler Dynamic - Power Plant - Vietnam Paper Corporation
Procurement Of Repair Services For Boiler Pcv Valves And Valve Balls Of Electrically Actuated Isolation Valves (Upstream Of Pcv Valves) For 2025–2026
Gt-2025-271: Hiring A Consultant To Verify The Feasibility Study Report For The Upgrading Item Of The Boiler Water Pump System To Increase The Load Capacity Of The Machine From 35%Ro To 50%Ro And Can Operate Synchronously With The Current Main Boiler Water Supply Pumps Of Thai Binh 2 Nmn 2
Invest In Boiler Capacity Of 5 Tons/H
Processing And Manufacturing Services Of Chemical Troughs Of The Boiler Recovered At The Power Plant - Vietnam Paper Corporation