Test Railway Tunnels
Fire Insurance Compulsory Buffalo Tunnel
Measurement Of The Current Map Of The Status Quo Land Rent 1/500, Excerpts For Land Rental Ground The Industrial Yard Of Khe Cham Mine Tunnel Project Ii-Iv
Upgrade The Asphalt From The Junction The Memorial Beer House To The Tunnel Junction
Providing Supplies And Tools For The Management, Maintenance Of Structure And Equipment Of The Saigon River Tunnel In 2025 (From September To December)
Buy Labor Protective Clothing; Processing Forest Products, Mechanical Processing, Tunnel Bricks And Construction In The Second Quarter
The Contractor Selection Plan For The Project Preparation Phase (Step Of Making A Pre -Feasibility Study Report) The Project To Build A Tunnel Through Cu Hin Mountain Connects From Lo River, Phuoc Dong - Nha Trang Commune To Cam Hai Dong - Cam Lam Commune, Location: Nha Trang City And Cam Lam District, Khanh Hoa Province.
Contractor Selection Plan (Additional) Project: 1. Installation Of 110 Kv Underground Cable Tunnel Monitoring System; 2. Enhance The Process Of Column 49-52 Ddk Lo 171, 172 E1.6 -E1.4 (Chem-Hanoi Dong)
Procurement Of Tunneling Materials For Training In The Military Training Industry
Upgrade The Asphalt From The Junction Of The Memorial Beer House To The Tunnels (Consulting Service Section)
Management, Operation And Maintenance Of The Saigon River Tunnel (Shopping For Supplies For Irregular Repair Of Equipment System, Structure Of The Saigon River Tunnel) - Phase 2 In 2025
Repair Damage To The Road Surface Of The Saigon River Tunnel Area, The Eastern Ventilation Tower And The Western Ventilation Tower Auxiliary Works
Testing Tunnels (Tunnel No. 4, 5, 6, 11, 12, 14, 15, 20, 21, 24, 25, 26, 27), Hanoi - Tp Railway. Ho Chi Minh
Son Covered The Tunnel Of Thu Duc Water Plant
Repair The Surface Of The Saigon River Tunnel (Cutting Groove)
Bidding Contractor Selection Plan: Construction And Repair Of Tunneling B1
The Plan To Select The Contractor Adds The Project To Complete The Collection Route Along The Two Sides Of The Male Tunnel By The Hai Van Tunnel (The Section Of Hoa Lien Loan)
Repair The Surface Of The Saigon River Tunnel (Cutting Groove)
Repair Damage To The Road Surface Of The Saigon River Tunnel Area, The Eastern Ventilation Tower And The Western Ventilation Tower Auxiliary Works
Management, Operation And Maintenance Of The Saigon River Tunnel (Shopping For Supplies For Irregular Repair Of Equipment System, Structure Of The Saigon River Tunnel) - Phase 2 In 2025