Bidding Package Ctmt-11: Purchase Of Silica Sand And Coal
3 Phase 7 Section Motor
Led Yard Headlights Include 01 Item
Buy Led Lighting For The Aircraft Apron To Enhance Lighting At Locations 37, 39, 41, 43A, 44A And Vip Guesthouses
Package 7: Procurement Of Fco, Lbfco, La, Low Voltage Distribution Cabinets, Power Supply Voltage Transformers And Isolators Of All Kinds For Western Province 2.
Package 8: Procurement Of Fco, Lbfco, La, Low Voltage Distribution Cabinets, Power Supply Voltage Transformers And Isolators Of All Kinds For Western Province 3.
Package 9: Procurement Of Meters, Current Transformers, Voltage Transformers, Dcus Of All Kinds For Units Under Evnspc.
Bidding Package Ctmt-11: Purchase Of Silica Sand And Coal
Package No. 18: Low Voltage Line Scl Behind Cam Pha Area Substations In 2025
Package No. 07: Consulting On Verification Of Technical Design, Design Of Technical Design-Dt - Project: 110Kv Transmission Line And Substation North Of Song Cam 2
Bidding Package No. 1: Procurement Of Materials To Install Water Meters At Water Supply Stations Managed By Dong Nai Provincial Agricultural Service Center In 2025
Construction And Equipment Installation
Consulting On Surveying, Preparing F/S Report And Tkbvtc-Dt For The Project "Renovating And Constructing Grid Connection Of 22Kv Transmission Lines Of 110Kv Stations Tan Uyen - Khanh Binh - Bau Beo"
Consulting On Surveying, Preparing F/S Report And Tkbvtc-Dt For The Project "Renovating And Constructing Grid Connection Of 22Kv Transmission Lines Of 110Kv Stations Thanh Phuoc - Thuan Giao - Vinh Truong - Go Dau"
Consulting On Surveying, Preparing F/S Report And Tkbvtc-Dt For The Project "Renovating And Constructing Grid Connection Of 22Kv Transmission Lines Of 110Kv Stations Vinh Loi - Dat Cuoc - Tan Uyen"
Bidding Package No. 112.2025 - Procurement Of Electrical Materials
3 Phase 7 Section Motor
Purchase Supplies For The Plan: "Replace 432 Thanh Xuan Cable With High Pd.
Xl2026_02. Construction And Installation Works: Improving Power Supply Capacity Of Voi Do Branch After E10.2 Van Dinh Substation, Ung Hoa District In 2026
Xl2025_12. Construction And Installation Works: Construction Of New Lines And Substations Supplying Power To Xa Cau Industrial Cluster - Phase 2, 2025