Summary:
Supply of Batteries Country:
Uganda Estimated Cost:
UGX 240000 Notice Type:
Procurement Plan Deadline:
30 Jun 2026 Posting Date:
01 Sep 2025 |
Summary:
Electrical consumables (Lights and lamps, Transformer Silica Gel, Carbon brushes, Electrical Contact cleaner, Insulating tapes and heat shrinkable tape, Electrical contact grease for MV, LV Switchgear, LV socket plugs, Assorted Fuses, Connector strips, Assorted Cable ties, lugs and clamps, Panel Filter elements, Industrial socket plugs, Soldering elements, Insulating foam, Damping Glycerine oil, Moulded case boxes, Electrical conduits, Insulators, Phase markers/ Panel labels, Alkaline dry batteries, AA, AAA, 9V, Soft felt brushes, Draw tapes, Inspection lamps, Industrial Power extension cable reels, Winding spirit, Portable electric hand tools) Country:
Uganda Estimated Cost:
UGX 105250000 Notice Type:
Procurement Plan Deadline:
30 Jun 2026 Posting Date:
01 Sep 2025 |
Summary:
Electrical items (Flygt ENM-10 Liquid level regulators, NPS Changeover Devices (AC Control supply undervoltage relay 415VAC), Transformers (Control Gates), Panel Fan (U11-15 Unit Computer Panels), Programmable Digital Timer, Contactors, Remote Station Push Button, Copper Strips, Charger spares, VaiLight LED Bulbs, LED Tube Lights, LED Flood lights, Top plugs Black, Insulation Tape, Batteries, Cable Lugs, Omicron Accessories, LC-LC multimode fiber optics and associated conduits, Supervision relays, Power Supply Modules (Governor Panel), IO modules, Governor panel spares, Analogue Gauges, Voltmeters, Ammeters (Aux pumps), KPS Transducers (Current, Voltage, Frequency), Magnetic float level switches, Pressure Transmitters, Carbon brushes for generators, Fiber glass filters for NPS generators, Air filter brackets for exciter panels, Plug in power control relays for NPS Units, Converter fan contactors, Converter fan manual motor starter, Earth Leakage MCB, Input Coupling Unit, Field flashing control fuses 10A, Field flashing control fuses 20A, Field flashing control fuses, Crowbar Current Transformer, Crowbar Resistor, Field flashing resistors, Converter fans for NPS Exciters, Converter fans for KPS Exciters, Surge Arresters, Capacitors for Exciters, Dual diodes, Optical fiber connector polishing kit, Bridge rectifier, Current Shunt Resistor, Excitation Service Level Agreement, Fibre Glass Ladders, Fibre Glass Scafolding, Contact Cleaner, Spare 132kV HV insulators for the 132kV Substation, Maintenance of the Oil regeneration plant + Provision of spares, Aluminium Clamps, Copper Brazing Rods BCU-P2, Brazing Ribbons, M24 PAL lock nuts, RS PRO Soldering Station 90W 220V, Materials for Motor Repair, Glass Tape, Flexible copper strip 1x 50mm, Plastic Filler Gauges for Rotor Air Gap measurement, R+C108otor Overhaul Consumables, Planned Outage Consumables) Country:
Uganda Estimated Cost:
UGX 521926759 Notice Type:
Procurement Plan Deadline:
30 Jun 2026 Posting Date:
01 Sep 2025 |
Summary:
Electrical spares (Electric valve Actuators, Governor Spares(position Sensors and limit switches), VFDs & Soft starters(spillways,cooling water,drainage and dewatering, Governor, Compressor etc), Motors (Cooling water,Fan etc), Excitation System Spares, PLCs, HMIs, Modules and Controllers, Auto Transfer Switches; ATS, Street Lighting & Bridge fittings, Wall fittings, Bulb Fittings, Contactors, DC system spares, Electrical cables, Split unit HVAC and accessories, Circuit breakers and accessories, Thermo overloads and relays, Spillway Gates, CCTV components, Panel indication & metering Instruments, Panel fan motors, Instrumentation(Sensors, level switches, Flow meters, Transmitters, flow switches, Pressure gauges, panel meters) etc., fire fighting and detection, gantry cranes, protection system, DC system battery replacement) Country:
Uganda Estimated Cost:
UGX 1600000000 Notice Type:
Procurement Plan Deadline:
30 Jun 2026 Posting Date:
01 Sep 2025 |
Summary:
REF 615 Excitation Transformer Protection Relay Spares Country:
Uganda Estimated Cost:
UGX 120000000 Notice Type:
Procurement Plan Deadline:
30 Jun 2026 Posting Date:
26 Aug 2025 |