Similar tenders from other countries.
Showing 1 to 20
M250-Ks4 Gas Turbine Engines
Providing Highly Efficient And Continuous Engineering Services For Open -Cycle Gas Turbines (Second Stage) At Al Sabya Station To Generate Electrical Power And Water Distillation
Supply and installation of electrical spare parts for gas turbines in Laayoune-El Marsa
Gas Turbine Delivery From 40 To 60 Mwe
Bidding Package No. 03-Ptv.01-Scl: Service Of Repairing Equipment Of Gas Turbines For Trung Tu Gt4 In 2025
Project Management And Supervision Management Services For The Project:
Building Power Plant With Cycle Combined With Winter Gas Turbines - Completion Of Works And Commissioning
Turbolub 32 Lubricating Oil Acquisition For Gas Turbine Turbines
Hiring Of Mobile Cranes With Operator For Gas Turbines And H-Station Bop At Generation Division
Procurement Of Air Conditioning Services
Tf-40 Disposal
1056427 - Dry Gas Seal Retrofit For Ards Recycle Gas Compressors C-41/42/81/82-001 And Control & Protection Upgrade For Driver Turbines C-41/42/81/82-001-T At Unit-41, 42, 81 & 82 In Maa Refinery
Providing Highly Efficient And Continuous Engineering Services For Open -Cycle Gas Turbines (Second Stage) At Al Sabya Station To Generate Electrical Power And Water Distillation
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Supply, Installation, Operation and Maintenance of Combined Cycle Gas Turbine Project (3600 MW) at Al-Nuwaiseeb - Phase 1
Refurbishment Of V94.2 Sgt5-2000E Version 6 Gas Turbines, Including The Supply Of Capital Spares, Special Tools, Required Resources, And Generator Rotor Removal, For The Nine (9) Peaking Generation Open Cycle Gas Turbine (Ocgt) Units At Ankerlig Power Station Over A Five-Year Period
Spare parts for the chemical injection system for the combined cycle gas turbines, phase 1, at Al-Zour South Station
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS