Similar tenders from other countries.
Showing 1 to 20
Necessary Materials For Electrical Installation.
Putting 8 Extractors And 3 Injectors Supply And Change Of 5 Extractors Mandatory Visit -Coordinate To The Mail: Angelica.Delossantos@Imm.Gub.Uy
Refaction Of Entry To Transmission Substation
Adaptation Of The Gas Installation Of The Los Cedros Building Of The Technological Educational Pole Utu Mandatory Visit: Wednesday 08/27 - 10:00 A.M. - Los Cedros Building - Utu Technological Educational Pole - Avenida Italia 6201, Montevideo, Uruguay Is Suggested
Acquisition Of Uninterrupted Feeding System (Ups).
Adq. Of Various Electrical Materials, Adjust To The Attached File (Exclusive)
Adq. Of Electrical Materials, Adjust To The Attached File (Exclusive)
59--Capacitor,Fixed,Pap
59--Resistor,Variable,W
59--Solenoid,Electrical
59--Relay,Electromagnet
Solicitation Number N40192-25-R-9017; Won 1845350 Repair/Replace Shore Power Mound Receptacles And Secondary Cables At Alpha And Bravo Wharves, Polaris Point, Naval Base Guam (Nbg). This Is A Restricted Solicitation Only For Contractors On The Small Busine
16--Housing,Actuator
28--Housing,Gearbox,Tur
66--Meter,Flow Rate Ind
59--Cable Assembly,Radi
59--Cable Assembly,Spec
61--Cable Assembly,Spec
59--Cable Assembly,Spec
59--Circuit Card Assemb