54 Live Notices for Spain tunnels tenders
Showing 1 to 20
Renewal Works Of The Catenary Of The Manresa-Viladordis Tunnel By Rigid Type Catenary, Of The Llobregat-Anoia Line Of Railways Of The Generalitat Of Catalonia (Pos91/25)
Services For The Drafting Of Construction Projects Relating To The Electrification System, The Railway Systems And The Security And Protection Facilities Of The Tunnel In The Northern Section Of Line 3 Of The Seville Metro
Project Work For The Construction Of The Infrastructure And Urbanization Of The Underground Extension Of Line 2 Of The Malaga Metro To The Civil Hospital. Section: Guadalmedina- Hilera
Tasks as a safety officer for tunnels under the direct management of the Directorate General of Road Infrastructure and acting as a tunnel inspection body for tunnels on the regional road network with a length of more than 500 m. (5-SR-58/2024)
Cooling, Shading And Environmental Control. Renovation Of The Aeroponics System In The Tunnel Greenhouse, Located In The Facilities Of The Basque Institute For Agricultural Research And Development Neiker, Arkaute
Project Drafting System Electrif., Railways And Installations Tunnel Sec. L. 3 Meter
Consultancy and assistance for the control of the execution works of the Algeciras - Zaragoza railway highway: -Line 400 protection and drainage of the slopes of the Andújar tunnel -Treatment of the Arroyo Arjonilla bridge and stabilization of cut rock -Embankments (PP.KK. 343+100 and 346+970)
Execution Of The Works Of The Urban Integration Platform Construction Project And Conditioning Of The Ourense Railway Network. Section: Taboadela-Rante Tunnel
Ballonti Pipeline Splitting Work - Las Carreras
Services For Carrying Out Main Inspections Of Tunnels Of The High Speed Network Administered By Adif – 2 Lots
Service for the Inspection and Control of the Tunnels of the Euskal Trenbide Sarea Network
Renewal Works Of The Catenary Of The Manresa-Viladordis Tunnel By Rigid Type Catenary, Of The Llobregat-Anoia Line Of Railways Of The Generalitat Of Catalonia (Pos91/25)
Supply And Transport Of Direct Fastenings For Ballastless Track And Transition Sleepers For The Algeciras – Zaragoza Railway Highway. Cárdenas Sales Tunnels 1, 2, 3 And 4; The Slides 1, 2 And 3; Saint Helena; Calanche; Vilches; Espeluy; Andújar; And Montoro.
Supply And Transportation Of Sleepers For The Algeciras – Zaragoza Railway Highway. Cárdenas Sales Tunnels 1, 2, 3 And 4; Las Correderas 1, 2 And 3, Santa Elena, Calancha, Vilches, Espeluy, Andújar And Montoro
The Contract Will Be The Purpose Of The Execution Of The Works Contained In The `` Evaluated Report Of The Works Of Rehabilitation Of The Well Of The Dump '', Drafted By Municipal Technical Services And Definitively Approved By Agreements Of The Local Government Board Of June 6, 2025. In Accordance With The Reported Report, Its Object Is To Describe The Necessary Actions For The Rehabilitation Of The Well. This Well Is Part Of The Facilities Of The Water Supply Service Of Bigues And Riells Del Fai, But Is Currently Out Of Service. The Nominal Flow Of The Installed Pump Is 45M3/H. The Water Supply Memory Plans To Make A Drilling With Simultaneous Casing, The Poul Coating With Pvc-U Pipe 280-250, As Well As The Well Equipment With The Pumping System And The Installation Of The Necessary Vertical Pipes. These Actions Are Subsidized Within The Framework Of The Acc/3498/2023 Order, Of October 17, Which Approves The Regulatory Bases Of The Subsidy To Local Entities For Investments For The Recovery, Rehabilitation, Adaptation And Execution Of Groundwater Catchments For Drinking Water Supply To The Population.
Supply And Transportation Of Sleepers For The Algeciras – Zaragoza Railway Highway. Cárdenas Sales Tunnels 1, 2, 3 And 4; Las Correderas 1, 2 And 3, Santa Elena, Calancha, Vilches, Espeluy, Andújar And Montoro
Supply And Transport Of Direct Fastenings For Ballastless Track And Transition Sleepers For The Algeciras – Zaragoza Railway Highway. Cárdenas Sales Tunnels 1, 2, 3 And 4; The Slides 1, 2 And 3; Saint Helena; Calanche; Vilches; Espeluy; Andújar; And Montoro.
Service For The Review And Control Of Tunnels In The Euskal Trenbide Sarea Network
Service For Modeling Rolling Stock Evacuation Processes In Tunnels Considering The Human Factor.
Execution Works Of The Construction Project Of The Oural Tunnel Located On The Monforte-Lugo Section Of Line 800: A Coruña-León