24 Live Notices for Slovenia architecture tenders
Showing 1 to 20
Production Of Idp Project Documentation For The Implementation Of Passive Anti -Air Mechanical Protection Of The Kastelec Tunnel
A-38/25; Production Of Exp And Pzis For The Regulation Of The Regional Road R3-677/2203 Nova Vas - Pišece From Km 4.700 To Km 6,000, Through The Village Of Pišece
A-40/25; Performing External Quality Control In Upgrading Railway No. 70 On The Sections Of Bled Lake-Bohinjska White And Bohinjska White
A-37/25; Production Of Pzi For Arrangement G2 108/1181 From 14.800 To 15,069 And G2-108/1182 From 0,000 To 1,250, By Arranging Connections For Ribče Settlement
A-20/24; Ujma: Production Plan At The Project Level For Implementation (Pzi) Rehabilitation Of The Bridge (Lj0002) Across Sora In Medvode On R1-211/0212 In Km 2,700
Replacement Of Diesel And Electric Fp Pump, And Replacement
Production Of Dgd/Pzi Project Documentation For The Construction Of A New Emergency Block With Archives At Upk Ljubljana
Review Pzi Documentation
Production
Preparation Of Dgd And Pzi Project Documentation For Double Berths, Transformer Station And Storage Space Arrangement, Including Design Surveillance
Public Contract Service By Open Procedure For Laying Flooring For Maintenance Of Mnz, Gpu, Border Crossings And Police Departments
Production Of Partial Pzis And Dzr Documentation In The Field Of Construction For Acoustic Cells
Production Of Project Documentation For The Construction Of The Center For Protection And Rescue - Negotiated Procedure
Proj Production. Doc. To Obtain The Proj. And Other Conditions, Proj. Doc. To Obtain Opinions And Buildings. Dov., Proj. Doc. To Carry Out Construction And Participation In The Process Of Obtaining Dg On Plaza Gradišče
Production Of Project And Tender Documentation In The Construction Of 110 Kv Hpp Switchgear Maribor Island With A Battery Saver
Supervision And Advisory Engineering In The Design And Construction Of The Arming/Disarming Platform/Disarmation Of Airplanes, Safety Embankments And Prefabricated Facilities For Hanging A Transport Aircraft And Spare Parts At Cerklje Ob Krki Airport
Production Of Pzi Project Documentation For A Comprehensive Arrangement
Production Of Project And Tender Documentation In The Construction Of 110 Kv Hpp Switchgear Maribor Island With A Battery Saver
A-37/25; Production Of Pzi For Arrangement G2 108/1181 From 14.800 To 15,069 And G2-108/1182 From 0,000 To 1,250, By Arranging Connections For Ribče Settlement
Setting Up A Private 5G Sa Mobile Network To Cover External Work Surfaces (Lot 1: Making A Geodetic Clip, Dgd, Pzi And Pid Documentation And Implementation Of Design Control)