53 Live Notices for Poland bridges tenders
Showing 1 to 20
7/Pn/24024/2025 Carrying Out Investor Supervision In The Field Of The Bridge And Railway Industry Over Construction Works Under Task No. 24024 Entitled: "Reconstruction Of The Railway Bridge On The Bóbr River And Access Roads" In Pstrąże
134/Bzp-U.510.118.2025/Mkl Renovation Of Tram Infrastructure In Podwale Przedmiejskie Street And Reconstruction Of The Bridge Over The Stara Motława River Along Podwale Przedmiejskie Street In Gdańsk
Zdp.241.55.2025 Reconstruction Of District Road No. 3305D, Km 0+000 - 0+700 [Flood - September 2024]
In.271.72.2025.Um "Reconstruction Of The Footbridge Over The Bóbr River"
Zdp.Nud.2230.75.2025 "Renovation Of The Culvert Under The District Road No. 3238P In The Town Of Zarzew"
Bzp.271.66.2025 Fulfilling The Duties Of The Investor Supervision Inspector Over The Implementation Of The Task Entitled Reconstruction Of The Bridge Along Ul. Walowa Góra In Zakopane
Wd/W/250930/1 An Order Consisting In The Repetition Of Similar Construction Works To The Task: Renovation Of Sections Of Province Roads With Numbers: Dw 901, Dw 915, Dw 944, Contract Wd-D/Tp/250714/1/1 Of September 17, 2025.
Performing Investor Supervision In The Field Of The Bridge And Railway Industry Over Construction Works Under Task No. 24024 Entitled: "Reconstruction Of The Railway Bridge Over The Bóbr River And Access Roads" In Pstrąże - 7/Pn/24024/2025
Construction Of The Connection Dk 87 With Dw 969 Along With The Construction Of A Bridge Over The River. Dunajec In Nowy Sącz
Emergency Repairs Of Bridges In The Wisła Forest District, Divided Into 2 Tasks 45246000-3
Emergency Repairs In The Forest Infrastructure Of The Wisła Forest District, Divided Into 5 Tasks 45243300-5
Zapu.271.1.21.2025.Mm Construction Of Street Lighting In Holendry Baranowskie. The Project Is Co-Financed Under The Bridge Program Of The Development Strategy For The Cpk 2025 Surrounding Area.
Mzd.341.107.2025 Winter Maintenance Of Municipal Roads And Sidewalks, Pedestrian Routes, Stairs And Footbridges In The Skoczów Commune In The Winter Season 2025/2026, Divided Into 10 Parts.
48/X/2025/Wp Provision Of Security Services In The Form Of Direct Physical Protection Of Facilities And Property Of The Municipal Administration Of Streets And Bridges In Katowice, Including Convoying Of Monetary Values Within A Period Of 12 Months
Dod/Dzin/2025/031 Reconstruction Of Track No. 316 In The Area Of Szczecińskie Quay On The Railway Siding Of Pga S.A.
Or.271.47.2025 Energy Modernization Of The Volunteer Fire Bridge Building In Cold Woda.
Provision Of Protection Services In The Form Of Direct Physical Protection Of Facilities And Property Of The Municipal Street And Bridge Management In Katowice Along With Convoying Monetary Values Over A Period Of 12 Months
Construction Works As Part Of The Task: "Pt And Construction Of An Access Road To The Property At 8 - 10 Głubczycka Street In Kędzierzyn -Koźle"
21/10/2025 Construction Of The Footbridge In Błażejewku
Zp/65/Tp/2025 08050 Development Of Project Documentation For The Task Entitled "Construction Of A Pedestrian And Bicycle Connection By Bobrowisko At Międzyrzecka Street In Wrocław