15 Live Notices for Luxembourg water and sanitation tenders
Showing 1 to 15
Redevelopment Of The Roadway And Sidewalks; Dry Network And Canal Works
Technical Assistance For Northeast Ramallah Wastewater Project - Phase 2 - Reuse Component
Scope Of Work: Dry Structures: Metal Frame Partitions 1,700 M2 Fire-Rated Metal Frame Partitions 700 M2 Lining Of Wooden Panels With Plasterboard 810 M2 Counter Fire-Rated Partitions 1,900 M2 Sanitary Installation Partitions 520 M2 False Ceilings: Plasterboard 580 M2 Fire-Rated Plasterboard 1,180 M2 Acoustic Plasterboard 490 M2 Doors: Wooden/Glass Doors 110 Pcs Wood/Glass Fire-Rated Doors 53 Pcs Fire-Rated Steel Doors 16 Pcs Sliding Doors 9 Pcs Sanitary Partition Systems: 62 Pcs Mobile Walls | Mobile Partitions: 2 Pcs Vertical Cladding: Wooden Acoustic Panels With Oak Slat Structure 450 M2 Wall Cladding In Oak Panels 103 M2 Sports Room Cladding In Fir Wood With Slat Structure 165 M2 Horizontal Cladding: Wooden Acoustic Panels With Fir Slat Structure 280 Ml Wood Fiber Acoustic Panels 35 M2 Acoustic Panel Suspended In Glass Wool, Baffles 5.120 Ml
Heating, Ventilation And Sanitary Facilities Ventilating Technical Premises. Evacuation Of Rainwater And Worn Out Of Covered Parking. Installation Of Toilets And Sanitary Equipment Accessible To People With Reduced Mobility.
Renewal Of Mixed Water Pipes And Drinking Water Pipe And Installation Of A Rainwater Axis
-The Purpose Of This Market Is To Build A Steel Railway Bridge, Part Of A New Jump-Out-Mouton Located South Of Bettembourg Station. This New Jump-De-Mouton Is Supposed To Avoid The Crossing Of The Bettembourg-Dudelange Line With Freight Trains From The West Of The Country And Entering The Sorting Of Bettembourg. - The Market Includes The Construction Of Reinforced Concrete Abutments, The Pre -Assembly Of The Steel Structure And The Shift In The Work On The Abutments. - Since The Work Is In Full Station And Since The Latter Must Remain In Service For Rail Traffic During The Work, With The Exception Of A Few Railway Dams Which Will Be Planned, Compliance With Deadlines And Safety At Work Is A Primordial Factor To Guarantee A Successful Completion Of The Work.
Within The Framework Of The Transformation And Enlargement Works Of The Bettembourg Police Station, Heating, Ventilation And Sanitary Works Are Necessary. The Heating System Will Be Modernized With New Panel Radiators And A New Piping To Improve Efficiency And Allow The Installation Of A Heat Pump. Ventilation Is Done Via Decentralized Devices With Heat Recovery For Offices And Changing Rooms, While The Toilets Are Equipped With Extraction Fans. Sanitary Facilities Include Replacing Wastewater And Cold Water Pipes, Decentralized Hot Water Production As Well As New Porcelain Health Equipment. The Duration Of The Work Is 100 Working Days, To Start The First Half Of 2026. The Work Is Sold At Unit Prices.
Expansion Of The Sewage Treatment Plant - Sbr - Submission Elmec
Expansion Of The Sewage Treatment Plant - Sbr - Submission Elmec
Heating And Ventilation And Sanitary Installations - 2 Urban Heating Transfer Stations - 3,500 M Piping - 87 Radiators - Heating Floor - 2 Ventilation Installations (9,000 M³/H + 22,000 M³/H) - 2 Production Hot Water Domestic - Setting Equipment Regulation, Electric Tables, Wiring - 160 Sanitary Appliances - 3,700 M Conduite (Distribution - Water System) Rainfall
Collection And Management Of Fixed Municipal Waste From Owners Of Real Estate Residing In The Dobra Commune
Technical Assistance For Northeast Ramallah Wastewater Project - Phase 2 - Reuse Component
Renovation And Repair Of The Sewage System In The Districts Of Hamm And Pulvermühl Of The City Of Luxembourg
As Part Of The Construction Of The New Reservoir Intended To Strengthen The Supply Of Drinking Water In The Upper Part Of Rue Dieswee, The City Of Esch-Sur-Alzette Also Plans To Redevelop And Modernize The Networks And Pipes Located In This Same Street. Subsequently The City Of Esch-Sur-Alzette Wishes, Via This Submission, To Requalify The Road Trunk As Well As The External Arrangements. In Addition, The Economic Operator Will Have To Ensure The Accessibility Of Rue Dieswee For The Francofolies Festival, Scheduled For June 12 To 14. Consequently, Whatever The State Of Progress Of The Work, No Site Should Be Underway On This Street During The Week 24 Of The Year 2026. The Trenches Will Have To Be Backfilled Using Bituminous Coated, In Accordance With The Css Directives, In Order To Ensure A Secure Flight Path For The Evacuation Of Emergency Services During The Festival. The Induced Costs Relating To The Provisional Closures Of The Coated Trenches Are Indicated In This Slip. Start/Duration Of The Work: First Quarter 2026/530 Working Days (2 Years)
Brief Description: The Works Essentially Include The Construction And Renovation Of Rainwater And Worn Water Pipes, The Construction Of A New Water Pipe, The Installation Of New Borders, The Widening Of The Sidewalks And The Restoration Of Paved Surfaces And Roads. Supply Networks Will Also Be Partially Renewed. Large Of Works: - Boarded Works: 6,000 M2 - Paving Work: 4,000 M2 - Work For Various Networks: 1500 M - Water Driving Work: 1,600 M - Dn Pipeline <800: 800 M Foreseeable Start For Work For January 2026. Duration Of Work 500 Working Days.