155 Live Notices for Luxembourg industry tenders
Showing 1 to 20
Terragement Works On The Territory Of The City Of Luxembourg In The Interest Of The Water Service Incumbent On The Following Shutters: 1) Civil Engineering Works In The Event Of Failures On The Water Network And Particular Branches 2) Civil Engineering Work In For The Replacement Of Dilapidated Connections 3) Works For The Compliance Of The Water Network (Replacement Of Valves, Fires, Etc.) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 4) 5) Construction Of Looks For Drinking Fountains.
Translation & Interpretation Services (Eng-Ukr)
Supply Of Pzh2000 Spare Parts - Lot 4
Provision Of Elbow Tube Used On Mk95A
Supply Of S723 Lrus
Hvac, Sanitary Facilities And Technical Regulation To Be Carried Out In The Interest Of The European School Approved In Junglinster
This Submission Mainly Concerns The Roof Insulation Work, The Implementation Of A Slate Blanket, The Tinkering Work, As Well As The Supply And Installation Of New Skylights And Rail Water Evacuation. The Site Being Located In The Protected Sector (Old Town) And Difficult To Access, The Direct And Indirect Environment Of The Site Must Be The Subject Of Particular Attention. The Duration Of The Work Is 60 Working Days, To Start The 1St Half Of 2026. The Work Is Sold At Unit Prices.
Safety Lighting: Central Battery, 92 Circuits Access Control: Interior And Exterior Doors Per Badges. Fire Detection: 450 Smoke Detectors. Lighting:> 1,600 Interior Lights, 45 Exterior Masts. Strong/Low Current:> 1,300 Catches, 300 Knx Buttons, 250 Knx Detectors. Tables: 1 Tgbt With 23 Sub-Rooms. The Duration Of The Work Is 415 Working Days, To Start The 3Rd Quarter Of 2026. The Work Is Sold At Unit Prices.
U1278-13 / U1279-20 / U1277-13 Construction Of A Storm Basin (V = 168M3) And A Spillway With Pumping Stations And Stockem Pipes (Civil Engineering And Electromechanical Equipment), And A Stormy Basin (V = 163M3) With Rumlange Pumping Station (Electromechanical Equipment)
Heating: 300Kw Sub-Station, Radiators. Cold: 2 Ice Water Groups (161Kw), Steel/Stainless Steel Networks. Ventilation: 13 Cta (43'975M³/H), Sheaths And Accessories. Sanitarians: Complete Equipment, Fat Separator, Softener, Stainless Steel Piping/Pp. Regulation: Gtc, Cabinets, Zone Regulations, 71.6Km Of Cables. The Duration Of The Work Is 663 Working Days, To Start The 3Rd Quarter Of 2026. The Work Is Sold At Unit Prices.
Construction Of A Water Tank In Kleinbettingen
Dental Supplies And Maintenance
Ruggedized Transport Cases For Electronic Equipment
Purchase Of Lead, Electrical
Provision Of Spare Parts For Ah-1W
Hematology Instrument Leasing And Supplies
Hotel In Copper Roofing
Ville De Ville- Rehabilitation Of The Natural Stone Facade
Acquisition Of New Furniture To Perform In The Interest Of The Redevelopment Of The Ulysses Center - New Concept "Housing First"
Door, Hatch, Vehicle - Part Number 10126-183520.000.0 For Bo