67 Live Notices for Luxembourg energy, power and electrical tenders
Showing 1 to 20
Expansion Of The Sewage Treatment Plant - Sbr - Submission Elmec
Bt And Cf Electrical Installations Including: Provisional Site Installation, Lightning Protection, ~ 1,500 M Cable Paths, ~ 20 Distribution Tables, ~ 700 Luminaires, ~ 1,000 Installation Equipment (Sockets, Switches, .), ~ 400 Detectors (Fire Detection, Intrusion And Smuggling), Knx, ~ 20,000 M It Access, Parlophony, Telephony, Cameras, Multimedia Equipment, Safety Facilities For People And Objects. The Duration Of The Work Is 590 Working Days, To Be Started In The 1St Quarter Of 2026.
Electrical Installations - Installation Shared Update - Distribution Tables - Cable Paths - Switches (Knx) And Sockets - Lighting (Interior - Outside - Relief) - Fire Detection - Debuting - Intrusion - Installations Telephones - Computer Network - Call Nurses - Access Control - Renita Installations - Parlophone - Surveillance - Sounding - Video Projection - Video Projection - Video Projection -
Cre_2025_090 Provision Of Electrical Energy For The Losses Cover 2027 - Lot1
Provision Of Electrical Energy For The Coverage Of The Losses Of The Network Managed By Creos (For The Period From 01/01/2027 To 12/31/2027) - Lot 1
Vdl - Electrical Installation Work To Be Carried Out As Part Of The Redevelopment And Extension Of The "Mombel -Klein" Farm In Educational Farm At 6, Rue D'Eschweiler In Rodenbourg
- Equipotential Earth Setting - 700 M Of Path And Cable Scale - Counting Table - Low Voltage General Table (Tgbt) - 5 Divisional Tables (Td) - Photovoltaic Decoupling Protection - Low Voltage Wiring, Low Current - 150 Switches And Sockets (Apparent And Recessed) - Floor Box - Pmr Kit - Stores And Lighting Management - 350 Lighting (Inner - Rescue) - Full Fire Detection - Services - Alarm Tele -Transmitter - Fibs - Fsd - Access Control - Data Start Of Work: June 2026 Duration Of Work: 240 J.O.
Supply Of Power Supply
Supply Of Electrical Energy In Mt/Bt For The Years 2026-2027
Supply Of Electrical Energy On Average And Low Voltage For Sidero Installations-Period 2026-2027
The Objective Of The Market Aims To Conclude A Contract For The Provision Of Services Relating To The Cleaning Of The Premises Of Buildings A, B And C Of The Ministry Of National Education, Children And Youth, Located In Clausen, Includes The Supply Of All Necessary Equipment (Consumables, Products, Technical Equipment), As Described In The Specifications.
Transformation Of The Ancienne Town Hall Of Manternach Into A Crèche With A Power Plant And An Urban Heating Network And Construction Of A Public Outdoor Parking
Construction Of A Conference Center In Mersch-Ministerial Authorization Fc01-2023-A091
Construction Of A Conference Center In Mersch-Ministerial Authorization Fc01-2023-A091
The Objective Of The Market Will Be The Conclusion Of A Contract For The Provision Of Services Relating To The Cleaning Of The Premises Of The Edward Steichen International School To Be Reullied, The Supply Of All The Equipment (Consumables, Products, Technical Equipment).
Lot 5: Middle Voltage Electrical Installation Work
Lot 4: Low Voltage Electrical Installation Work And Low Currents
9700 - Project "An Der Schmëtt" In Wecker - Installation Of 146 Carports - Locksmith Work - Metal Framework Work - Electrical Works
Installation Work Of Elevators To Be Carried Out In The Interest Of The Lëtzebuerg Police Project And Administrative Building In Wiltz - New Construction
1 Elevator 630 Kg / 8 People 1 Elevator 1,000 Kg / 13 People The Duration Of The Work Is 50 Working Days, To Start The 1St Quarter 2026.