2185 Live Notices for Asia Pacific bridges tenders
Showing 1 to 20
Bridge And Culvert Protection Works Along Seti Highway And Silgadhi-Chaukhutte Road.
Construction Of Bihani Tole &Amp; Mitratole Link Aapkholi Bridge Birendranagar-5, Surkhet
Loan-4551 Fij: Critical Bridges Resilience Project - Fra/Cbr/25-19-Pmu Project Accountant (56215-001)
Package No. 22 (Xl-05): Building And Upgrading The Route Connecting The Project Head Point (Route Dt.979) With The Road To Phuoc Long 2 Bridge Existing; Upgrade The 1,000 Canal Route From The Project (Route Dt.979) To The Existing Road Of 30/4 Channels; Renovate And Upgrade The Road Along The Canal Of 6,000 Ninh Thanh Loi Commune; Renovate And Upgrade The Loc Ninh - Ninh Thanh Loi Route From The Project (Dt.979 Route) To The Commune Bridge (Including Traffic Guarantee Expenses)
Dalin Factory, Area C, Second Bridge Power Drive Change (Buy-And-Place Installation)
I'M Working On The Design Of A Surveillance Technology Service Commissioned By The Engineering Commission For The Improvement Of Bridges Along The Sea In The Da-A Area.
1K+300 Bridge Project Under The New Lodge Bridge
Under The Western Bridge In Da An, Central City, And Under National Road No. 3 In Mist Peak District, The Engineering Commission Has Been Tasked With Planning The Design Of A Surveillance Technology Service.
Heavy Rains (G1) In May Of The Year 114 - Rebuilding Project On The Collapse Of The Bridge Pits In The Village Of Noujin In The Village Of The Lions
Refurbishment Of The Road On The Road At The Foot Of The Stone Bucket Bridge In The Public Village Of Cammy-(H3) July 113
Taiwan-Maran Bridge Deep Well Power Acquisition
Down-Swap Governance Works At The Brookway Drain Rehabilitation Bridge
Down-Swap Governance Works At The Nancing Water And Sewer Bridge (Line 168)
Drainage Below The Unknown Bridge In The Brook.
Refurbishment Works In 114 At 0510 In The Middle Of The Rainforest Town (Upper 166-Line 3 Bridge)
Renovation Of The Query Bridge In Bamboo Town Street Drain And Drain.
New North Bridge River Creek Campus Campus Improvement Project
I'M Working On The Sewage Pipework Project At The Bridge Station.
Rebuilding Work Following The October 113 Disaster Near The 210-1 Area Of The 6Th Brook Of Champagne Foot Bridge Up To The 6Th Brook In The Correy Wind And White River.
In 114, The Bay Bridge Deer Mansion Was Commissioned By The Director Of Public Art In The Building.