Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

Text: The Feedback Is Published In The Attached Questions Received: 1. Subbapal: In The Specifications, Page 10 Is Written That It Is "Absolutely Forbidden", While In The Disciplinary, Page 4 Is Indicated That Subcontracting The Full Execution Of The Services Is Prohibited, While It Is Allowed To Use It Partially, According To The Provisions Of The Code. He Therefore Asked To Clarify The Possibility Or Not To Resort To Subcontracting. 2. Installed 3-Quadro_Tecnico_Economico: An Amount Of € 35,409.00 / Month For Remote Supervision Is Indicated And In Art.1 Of The Specifications Refers To Annex A For The Specifications Of The 2 Plants To Be Installed. Except For Errors We Do Not Find The Attachment A With These Specifications In The Tender Documents, Therefore More Details Are Wondered On What The Service Defined In The Economic Framework As "Remote Supervision" Provides. In Addition To The Specifications On The Plants To Be Installed, It Is Asked: Is The Supply Of Peripherals On Other Pre -Existing Systems Are Envisaged? Or Only The Connection With Our C.O. What About Alarm Intervention? Is The Maintenance Of The Plants Borne By The Municipality? The Type And Number Of Plants (And Respective Addresses Of The Sites) Are Then Required, If Pre -Existing. 3.Sopralluogo: The List Of Sites Covered By This Tender Is Requested, With Respective Addresses, The Opening Hours And The Methods Of Access Subject To The Tender. It Is Therefore Asked That The Inspections Must Be Carried Out Independently And Without Notice. 4. Auction Time Hourly Ram: In The 3 -Quadro_Tecnico_Economic Attachment And In The Specifications, Page 2, The Amount Of € 19.95 Is Indicated As Time Cost - Hourly Rate. A Verification Of This Amount Is Requested As, In Our Opinion, Too Small As A Auction Base For A Tender Which, Among Other Things, Requires That They Enhance A Lot Of Qualitative Aspects That Then Affect The Pure Cost Of Labor. 5.Cposed, Art.22 Award Criteria: Confirmation Is Requested That The Certification Requested Both The Iso 22301: 2019 And That Therefore The Indication Of The Uni E22301 Is A Failure Of 6.If Available, A Draft Of The Contract Is Requested.

PROVINCIA DI FOGGIA Italy has Released a tender for Text: The Feedback Is Published In The Attached Questions Received: 1. Subbapal: In The Specifications, Page 10 Is Written That It Is "Absolutely Forbidden", While In The Disciplinary, Page 4 Is Indicated That Subcontracting The Full Execution Of The Services Is Prohibited, While It Is Allowed To Use It Partially, According To The Provisions Of The Code. He Therefore Asked To Clarify The Possibility Or Not To Resort To Subcontracting. 2. Installed 3-Quadro_Tecnico_Economico: An Amount Of € 35,409.00 / Month For Remote Supervision Is Indicated And In Art.1 Of The Specifications Refers To Annex A For The Specifications Of The 2 Plants To Be Installed. Except For Errors We Do Not Find The Attachment A With These Specifications In The Tender Documents, Therefore More Details Are Wondered On What The Service Defined In The Economic Framework As "Remote Supervision" Provides. In Addition To The Specifications On The Plants To Be Installed, It Is Asked: Is The Supply Of Peripherals On Other Pre -Existing Systems Are Envisaged? Or Only The Connection With Our C.O. What About Alarm Intervention? Is The Maintenance Of The Plants Borne By The Municipality? The Type And Number Of Plants (And Respective Addresses Of The Sites) Are Then Required, If Pre -Existing. 3.Sopralluogo: The List Of Sites Covered By This Tender Is Requested, With Respective Addresses, The Opening Hours And The Methods Of Access Subject To The Tender. It Is Therefore Asked That The Inspections Must Be Carried Out Independently And Without Notice. 4. Auction Time Hourly Ram: In The 3 -Quadro_Tecnico_Economic Attachment And In The Specifications, Page 2, The Amount Of € 19.95 Is Indicated As Time Cost - Hourly Rate. A Verification Of This Amount Is Requested As, In Our Opinion, Too Small As A Auction Base For A Tender Which, Among Other Things, Requires That They Enhance A Lot Of Qualitative Aspects That Then Affect The Pure Cost Of Labor. 5.Cposed, Art.22 Award Criteria: Confirmation Is Requested That The Certification Requested Both The Iso 22301: 2019 And That Therefore The Indication Of The Uni E22301 Is A Failure Of 6.If Available, A Draft Of The Contract Is Requested. in Human Resources. The tender was released on Sep 04, 2025.

Country - Italy

Summary - Text: The Feedback Is Published In The Attached Questions Received: 1. Subbapal: In The Specifications, Page 10 Is Written That It Is "Absolutely Forbidden", While In The Disciplinary, Page 4 Is Indicated That Subcontracting The Full Execution Of The Services Is Prohibited, While It Is Allowed To Use It Partially, According To The Provisions Of The Code. He Therefore Asked To Clarify The Possibility Or Not To Resort To Subcontracting. 2. Installed 3-Quadro_Tecnico_Economico: An Amount Of € 35,409.00 / Month For Remote Supervision Is Indicated And In Art.1 Of The Specifications Refers To Annex A For The Specifications Of The 2 Plants To Be Installed. Except For Errors We Do Not Find The Attachment A With These Specifications In The Tender Documents, Therefore More Details Are Wondered On What The Service Defined In The Economic Framework As "Remote Supervision" Provides. In Addition To The Specifications On The Plants To Be Installed, It Is Asked: Is The Supply Of Peripherals On Other Pre -Existing Systems Are Envisaged? Or Only The Connection With Our C.O. What About Alarm Intervention? Is The Maintenance Of The Plants Borne By The Municipality? The Type And Number Of Plants (And Respective Addresses Of The Sites) Are Then Required, If Pre -Existing. 3.Sopralluogo: The List Of Sites Covered By This Tender Is Requested, With Respective Addresses, The Opening Hours And The Methods Of Access Subject To The Tender. It Is Therefore Asked That The Inspections Must Be Carried Out Independently And Without Notice. 4. Auction Time Hourly Ram: In The 3 -Quadro_Tecnico_Economic Attachment And In The Specifications, Page 2, The Amount Of € 19.95 Is Indicated As Time Cost - Hourly Rate. A Verification Of This Amount Is Requested As, In Our Opinion, Too Small As A Auction Base For A Tender Which, Among Other Things, Requires That They Enhance A Lot Of Qualitative Aspects That Then Affect The Pure Cost Of Labor. 5.Cposed, Art.22 Award Criteria: Confirmation Is Requested That The Certification Requested Both The Iso 22301: 2019 And That Therefore The Indication Of The Uni E22301 Is A Failure Of 6.If Available, A Draft Of The Contract Is Requested.

Deadline - Sep 29, 2025

GT reference number - 117208225

Product classification - Recruitment services

Organization Details:

  Address - Italy

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 117208225

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: Procedure qualification: tender No. 2391/2025 - S.U.A - Municipality of Foggia - Open procedure, pursuant to art. 71 of Legislative Decree No. 36/2023, for the assignment of the contract concerning the armed supervisory service on the re al estate of ownership and relevance of the Municipality of Foggia for the duration of three yearslocal title:: Testo : Si pubblica, in allegato, il riscontro ai seguenti quesiti pervenuti: 1.Subappalto: nel Capitolato, pag.10 è scritto che è "assolutamente vietato", mentre nel Disciplinare, pag.14 è indicato che è vietato subappaltare l'integrale esecuzione delle prestazioni, mentre è consentito ricorrervi in misura parziale, secondo quanto

Gt Ref Id - 117208225

Deadline - Sep 29, 2025

Share share

Similar Tenders :

Summary:
Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database