Description |
INDIRA GANDHI INSTITUTE OF DEVELOPMENT RESEARCH GOREGAON (EAST), MUMBAI TENDER DOCUMENT FOR Supply, Installation, Testing, & Commissioning (SITC) of Split type Air Conditioning units at IGIDR NIT No. IGIDR/Tender/2024/ED/04 Date: 14.02.2024 INDIRA GANDHI INSTITUTE OF DEVELOPMENT RESEARCH _ Gen. A.K. Vaidya Marg, Film city Road, Santosh Nagar, Goregaon (East), Mumbai-400065. Telephone: 022 6909 6200/502/9920153014. Fax: 022 6909 639 2 INDIRA GANDHI INSTITUTE OF DEVELOPMENT RESEARCH, MUMBAI Notice Inviting Tender “NAME OF THE WORK: Supply, Installation, Testing, & Commissioning of Split type Air Conditioning units at INDIRA GANDHI INSTITUTE OF DEVELOPMENT RESEARCH, GOREGAON, MUMBAI – 400 065.” 1. Institute invites bids from reputed & qualified bidders for the following work: Name of work Completion Period EMD (INR) (1) (2) (3) Supply, Installation, Testing, & Commissioning of Split type Air Conditioning units at IGIDR 3 Weeks INR 13,000.00 2. The tenders being invited for the above mentioned work. IGIDR Mumbai reserves its right to award the work to the successful bidder. 3. Bidder has to deposit Earnest Money of Rs. 13,000.00 (Rupees Thirteen Thousand only) along with the bid. 4. The tender bids in two bid system are invited through two separate Emails to tender@igidr.ac.in : “Email-1: EMD and Pre-qualification/Technical Bid” and “Email2: Financial bid”. Subject of email should be mentioned as “Email-1: EMD and Prequalification/Technical Bid for Supply, Installation, Testing & Commissioning of Split AC units at IGIDR” and “Email-2: Financial bid for Supply, Installation, Testing & Commissioning of Split AC units at IGIDR” respectively. All the bid documents should be attached as a PDF document or zip file and the financial bid file should be protected with a password. 5. Last date of submission of Tender document shall be up to 6 th March 2024, the end of the day. 6. The institute reserves the right to reject any prospective application without assigning any reasons whatsoever. 7. Before quoting the rates, contractor should inspect the site and understand themselves about the nature, and scope of the work. |