Description |
Sign & seal of contractor Page 1 of 6 FORM OF QUOTATION NOTICE Quotation no. : INFOPARK/KOCHI/QTN/038/ 2024 Name of Work : SITC of change over switch and allied works in the USS, Infopark Phase-2. Due date and time of receipt of quotations : 29-04-2024 3:00 p.m. at Infopark Kochi, Park Centre at Kakkanad. Due date and time of opening of quotations : 29-04-2024 3:30 p.m. at Infopark Kochi, Park Centre at Kakkanad. Date up to which the rates are to remain firm for acceptance : 90 days Performance Security deposit : 2.5% of gross amount Time of completion : 30 days from the date of W. O Designation and address of Officer to whom the quotation is to be addressed : Chief Executive Officer, Infoparks Kerala Park Centre Infopark Kochi P.O., Kakkanad Kochi – 682 042 Name and address of the bidder : GST No: - Sealed quotations are invited for the Supply Installation, Testing, and Commissioning of change over switch and allied works in the USS, Infopark Phase-2, Kochi SEZ from Sign & seal of contractor Page 2 of 6 financially sound and experienced “B” Grade Electrical contractors. Necessary proof and registration certificates to be submitted. Scope of work: The scope of work includes Supply, Installation, Testing, Commissioning and Earthing of free standing 125A Changeover Switch Board and allied works in USS at Infopark - Phase 2, Kochi SEZ. Details are furnished below. SITC of change over switch and allied works in the USS, Infopark Phase-2 Sl.No Description Qty Unit Rate Exclusive of taxes Amount Exclusive of taxes 1 Supply, Installation, Testing, Commissioning and Earthing of free standing/panel top mounted 125A Changeover Switch Board of cubicle type made out of 16 SWG thick CRCA sheet, totally enclosed, vertically mounted, dust and vermin proof, outdoor installation, rust inhibited and duly powder coated with necessary cubicle hinged doors, including internal wiring with suitable size wires/cables, suitable for operation on 3phase, 415V, 50Hz AC system. 1 Nos of Manual Changeover Switch 125A with off position, 4P, 415V, 50Hz with Terminal Shroud, Phase barriers, Source separators and Extended handle with shaft. 2 set of LED type RYB Indication Lamp for Incomer 1 and Incomer 2. Scope include supply and termination of flexible copper cable of suitable rating (for 125A rating) to connect from the outgoing of change over switch to the incomer of the existing panel (R,Y,B,N) and completion of all connected works. Note : Change over switch GA drawing shall submit for approval before manufacturing. Approved makes : L&T, ABB, Siemens, Havells 1 No Sign & seal of contractor Page 3 of 6 2 Laying, Testing and Commissioning of 1Run X 3.5 core X 95sq.mm AL armoured UG power cable, 1.1 KV grade using clamps noted along with the cables, spacing of clamps not exceeding 60cms, making good the damages, colour washing etc. as required. 10 Meter 3 Dismantling and rerouting of existing 4C X 10Sq mm AL armoured UG power cable from USS panel and connect to the street light panel outgoing feeder. Scope include retermination of the cable include all accessories. 1 Lum psum 4 Supply and end termination of 1Run X 3.5 core X 95sq.mm AL armoured UG power cable of 1100V grade and connection of leads including the supply of Aluminium cable lugs but including cutting stripping of cable insulation, providing Single compression type glands, terminals, and Armor earthing, crimping the lug on to the conductor, clamping of the cablecores, marking with wire number ferrules 2 Nos 5 Supply and end termination of 4 core X 10sq.mm AL armoured UG power cable of 1100V grade and connection of leads including the supply of Aluminium cable lugs but including cutting stripping of cable insulation, providing Single compression type glands, terminals, and Armor earthing, crimping the lug on to the conductor, clamping of the cable-cores, marking with wire number ferrules. 1 No 7 Supply, Installation, Testing and Commissioning of multi-function meter with KWH facility in the existing panel. Approved makes: L&T, Schneider, Siemens, Elmeasure, Selec, ABB 2 Nos Total Amount Exclusive of All Taxes Total Amount in Words: Sign & seal of contractor Page 4 of 6 The work shall include cost of all materials and conveyance, other accessories, labour charges, hire charges plant and machinery, overheads and all incidental charges for execution of contract as per standards etc. complete as per direction of Engineer-in-charge and as per items scheduled in the Bill of Quantities. The work includes all necessary services and furnishing of all labour, materials, and items of equipment, tools and related items as per the quotation for the full performance of the contract items. Terms and conditions: 1. The quoted rates shall be inclusive of materials, transportation, duties, levies, freight, handling, loading, unloading, insurance, and premiums etc complete and shall remain firm throughout the contract period, irrespective of the variation in quantities. GST will be exempted as the work site is in SEZ. GST will be zero rated in Phase 2 SEZ. 2. The contractor is expected to inspect the site of the proposed work and acquaint himself with the site conditions before quoting his rates. 3. Infopark may make any alteration, additions to or omissions from the work described that may in their opinion be necessary and the contractor shall carry out the same. Infopark reserves the right to add new items or operate/cancel any of th |