Description |
Quotations in sealed covers superscribed as “Shifting & fixing of LT Control Panels from Container Yard Transformer Centre to KK Gate Transformer Centre” are invited in accordance with the details, instructions and conditions of contract as detailed below. Quotations may please be sent by post/courier duly addressed to Executive Engineer(Ele)II, Electrical division, Admin Building, NMPA, Panambur, Mangaluru - 575010, so as to reach not later than 3.00PM on 10.04.2024. Quotations will be opened on the same day at 3.30 PM in the presence of the Bidders who wish to be present. Sl. No Item Description. Qty Amount (Rs.) 1 Increasing the height of existing feeder pillar foundation by 2 feet from ground level using stones providing new base plate and re-termination of following cables 1. 3.5 C x 240 Sq.mm - 1No 2. 3.5 C x 95 Sq.mm - 2 Nos 3. 3.5 C x 16 Sq.mm - 2 Nos 1 No 2 Removing the SS LT panel from container yard site, Repairing the SS doors, hinges, locks. Transportation to KK gate yard structure (around 4km), Fixing it to existing foundation (Repairing foundation if required) and making the termination of existing cables (400 sq mm-2 Nos, 95 sq mm-1No, 25 to 50 Sq mm-6 Nos) (Work includes removing the old panel at KK Gate structure and transporting it to sub divisional premises (around 3.5 KM) 1 Job Total Rs. Applicable GST (%) Terms & Conditions: 1. The time allowed for completion of subject work is 30 (thirty) days from the date of issue of work order. 2. The rate quoted shall be firm and applicable GST shall be mentioned separately. 3. The Site to be inspected before quoting the rates for the subject work. 4. The evaluation shall be done on the basis of total lowest value (L1) quoted. The GST element if any will not be considered for evaluation. 5. The tenderer should submit copy of Valid Electrical Contract license & GST Registration certificate along with the offer. 6. Please note that no advance payment will be made. Payment will be released within 15 days after satisfactory completion of the subject work to the entire satisfaction of the Engineer-in-Charge. 7. The Guarantee of one year to be provided for the entire subject work from the date of completion of work. 8. The Rates quoted should be valid for 90 days. 9. No tools, plant, labour, equipment, transport etc. required for the work will be provided by the Department and the Contractor has to make his own arrangements. 10. Port entry passes to the Contractor and his workmen and vehicle will be issued as per rules on chargeable basis. 11. The Tenderer shall be responsible for making good of all the damages done during the supply if any. 12. The Tenderer shall be responsible for taking precautionary measures for the safety of the workmen working under him and the responsibility arising due to any mishap during the work, payment of any compensation etc., lies entirely on the part of the Contractor. Safety Items required are to be provided by the Contractor. 13. The Tenderer has to submit an undertaking before the commencement of work as follows |