Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

Loan-4575 Arm: Resilient And Inclusive Road Sector Improvement Project - Adb/Rirsip/Cs-02 Consulting Services For Construction Supervision Services On The Resilient And Inclusive Economic Corridor Improvement Project For Northern Section Of Sisian-Kajaran Road (56317-001)

Asian Development Bank Armenia has Released a tender for Loan-4575 Arm: Resilient And Inclusive Road Sector Improvement Project - Adb/Rirsip/Cs-02 Consulting Services For Construction Supervision Services On The Resilient And Inclusive Economic Corridor Improvement Project For Northern Section Of Sisian-Kajaran Road (56317-001) in Architecture. The tender was released on Jul 15, 2025.

Country - Armenia

Summary - Loan-4575 Arm: Resilient And Inclusive Road Sector Improvement Project - Adb/Rirsip/Cs-02 Consulting Services For Construction Supervision Services On The Resilient And Inclusive Economic Corridor Improvement Project For Northern Section Of Sisian-Kajaran Road (56317-001)

Deadline - Aug 27, 2025

GT reference number - 113336281

Product classification - Architectural, construction, engineering and inspection services

Organization Details:

  Address - Armenia

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 113336281

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description:  “North-South Road Corridor Investment Program” is a major infrastructure program (hereafter NSRCIP program) which aims at connecting the Southern border of the country with its Northern point by means of 556 km-long Meghri-Yereva n-Bavra highway by reducing it to about 85km and reaching up to 470 km. North South Corridor is also a part of the Asian Highway corridor (AH 82) which connects the Central Asian countries (Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan and Uzbekistan). As a result, the reconstruction of the current road of 556 km of the 2nd category with the average speed limit of 60 km/h will reach to 470 km road with 80-100km/h as a result of which the cross

Gt Ref Id - 113336281

Deadline - Aug 27, 2025

Share share

Similar Tenders :

Summary:
Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database